My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-2013 Council Workshop Minutes
>
City Council Meeting Minutes
>
2010-2019
>
2013
>
10-23-2013 Council Workshop Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2013 1:45:15 PM
Creation date
11/1/2013 1:45:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />OCTOBER 23, 2013 <br />budget amount. Keis indicated that the number is a place holder in the <br />Capital Improvement Budget, and suggested that it will take additional <br />meetings with the Council to finalize the parameters of the project. <br />The Administrator pointed out the zoning issues he raised relative to this <br />property, and asked if St. John's Church should be contacted relative to <br />resolving these issues. Council agreed. <br />At this point in the workshop, the Administrator continued his review of <br />Capital Improvement Fund expenditures outlined in staff's October 18, <br />2013 report. There was discussion about the cost to repair /replace /restore <br />pavers in Pioneer Park. The Director indicated that 80% of the pavers are <br />in good condition, with the remainder needing leveling. It was felt that <br />retaining the existing paver system would be less expensive than replacing <br />the pavers with concrete. He also noted that there is concrete under the <br />building structure, which is heaving in some places. Therefore, concrete <br />would not resolve the settling problem that has been experienced with <br />pavers. The Council discussed the $85,000 budgeted for swale grading <br />and restoration around the ball diamonds and dredging the pond south of <br />the bridge in Pioneer Park. The Administrator noted wash -outs that are <br />occurring after rains and the high cost of restoration. The City Engineer <br />has looked at this problem and is recommending a permanent solution to <br />this problem. <br />The City Administrator again stated that the Capital Improvements <br />included in this budget are placeholders and that the intention is to get full <br />life from equipment, etc. He noted that the expenditures budgeted for <br />2014 comprise a big number. The Administrator pointed out that the City <br />had levied $83,000 annually for capital items, but then switched this <br />revenue source to LGA dollars. He again noted the City's General Fund <br />Policy which would allow for the transfer of over $500,000 into the <br />Capital Improvement Fund, maintaining General Fund reserves at the high <br />end of the range, or 62 %. <br />The Administrator continued with a review of other funds. These include <br />the 10% Gambling Fund, with 2013 revenues projected to be down. I -Ie <br />noted that the primary expense to this account is the City's $4,000 <br />contribution toward Canadian Days fireworks. The Administrator stated <br />that given this fund balance, the City would be able to take on a park <br />project, if the Council so desired. <br />Next reviewed was the Infrastructure Fund with the Administrator <br />reviewing potential 2014 projects. He noted that the Fund will support <br />approximately $1 million in project costs each year. Blesener asked the <br />status of the Water Works Trail Extension. The Public Works <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.