Laserfiche WebLink
DETAILED WORK PLAN- continued <br />As our team develops the documents for the Pre - design phase, including <br />conceptual diagrams, drawings, models, and design guidelines we will also <br />provide a thorough analysis of the systems equipment, maintenance <br />equipment, and materials that are to be stored, maintained, serviced, and used <br />at the maintenance facility. Identifying and evaluating the potential future <br />HVAC equipment, maintenance equipment, systems, and materials to be used <br />at the site are critical to the long -term success of the facility. This document <br />will help provide the appropriate direction for the overall site and building <br />designs, systems designs, initial cost estimates, initial scheduling goals, <br />environmental impact, operational impact, and ultimately the successful <br />feasibility of the project. <br />Concurrently we will begin developing schematic designs of the maintenance <br />facility and systems for discussion and review by the City staff and the <br />Construction Manager. We find this step to be invaluable in that it provides an <br />accurate representation of the overall systems of the building and site, the <br />potential detailing, and overall operations of the facility. As an integral part of <br />the design process, the conceptual diagrams generated are updated along with <br />the evaluations, plans, and all associated documents during all of the design <br />phases for an accurate representation of the final built product. <br />The Pre - design services will also include coordination with all stakeholders and <br />the Construction Manager for development of the cost estimate, estimated <br />project schedule, conceptual plans, program analysis, utility review, code <br />analysis, environmental assessment, project work plan, incorporation of <br />sustainability components and the completed Predesign document. <br />Pre-Design deliverables will include the following: <br />• Summary of sustainability goals and project objectives <br />• Diagrammatic conceptual site and building options <br />• Initial space program document <br />• Initial project work plan <br />• Estimated project schedule and budget (with C.M.) <br />• Initial recommendations for mechanical /electrical systems <br />• Maintenance equipment recommendations <br />To begin the Schematic Design phase, we will review the deliverables that <br />were the end result of the Pre - design phase with the staff of Little Canada, and <br />all other project associated conditions, to consider the project design <br />constraints and opportunities. We will also synthesize the facility staff <br />suggestions with any other pertinent parties of the City to ensure all parties are <br />in clear agreement of the objectives and potential outcome of the project. <br />7 <br />35 <br />