Laserfiche WebLink
Landscaping. The southern boundary area adjacent to the existing office /warehouse building <br />is proposed to be bermed and landscaped to screen the two projects from each other. The <br />landscaping in the parking lot meets the minimum requirement of the landscape ordinance. <br />However, some concern is raised regarding the screening along the eastern property line within <br />Phase 2 of Development. Given the fact that east of the subject site is a single family <br />residential area, screening along the eastern property line is very important, as such, the <br />applicant may wish to consider increasing the density of evergreen trees or at least staggering <br />the trees to create a "wall" of screening. Further the coniferous trees will only serve as an <br />adequate screening material for six months out of the year, therefore, additional evergreen may <br />be necessary west of the proposed coniferous trees to provide for year -round screening. <br />Trash Handling. The new plans appear to locate trash handling equipment within the <br />proposed buildings, rather than next to the detached garages that have been removed from the <br />site plan. <br />Signs. The sign plan appears to be generally the same as the previous plans, with wall sign <br />identification on each building, and a pylon sign near the entrance drive. <br />NSP Easement. One storage garage and dumpster area is shown on the future Phase 2 plan, <br />which appears to be consistent with the documentation provided with the plans. This area is <br />located within a 225 -foot wide NSP easement, which overlays the southern two - thirds of the <br />site. As noted in our office's review of previously submitted PUD plans, Ms. Judy Slavik of <br />NSP has indicated that the erection of structures within the easement is strictly prohibited. As <br />such, the applicant should provide documentation that the location of such structures is <br />acceptable to NSP or the garage and dumpster should be either relocated or removed from the <br />Phase 2 plan. <br />Drainage Easement. Currently a 20 -foot wide drainage and utility easement subdivides the <br />eight building sites into eastern and western halves. Such easement is not, however, illustrated <br />upon the final plat. If the said easement is to be vacated it must be found to be acceptable by <br />the City Engineer. <br />Property Owners Association. According to the Zoning Ordinance, common open space <br />provided as part o a PUD may be placed under the ownership of a property association <br />provided a specific set of conditions are met. As a condition of development/final plan stage <br />PUD approval, a declaration of covenants should be submitted and subject to review and <br />approval by the City. <br />2 <br />Page 2 <br />