Laserfiche WebLink
CHANGE ORDER #3 SUMMARY <br />PROJECT: LITTLE CANADA ROAD IMPROVEMENTS <br />OWNER: CITY OF LITTLE CANADA & RAMSEY COUNTY <br />ITEM <br />NQ. <br />ITEM OgSCRIPTION <br />UNIT PRICE <br />• <br />TOTAL PRIC <br />SCHEDULE 1.0 - 16" WATERMAIN OFFSET <br />1 SPEC CREW TIME <br />2 SPEC WATERMAIN MATERIALS <br />3 SPEC INSULATION <br />SCHEDULE 1.0 - 16" WATERMAIN OFFSET • TOTAL <br />HR <br />LS <br />SF <br />6 <br />1.00 <br />64.00 <br />$759,00 <br />$8,240.10 <br />$3.85 <br />4,554.00 <br />8,240.10 <br />246.40 <br />$13,040.50 <br />SCHEDULE 2.0 - IRRIGATION REPAIRS <br />1 SPEC 300 LC ROAD LS 1.00 $2,873.63 2,873.63 <br />2 SPEC 2637 SCHLETTY DRIVE LS 1.00 $77.75 77.75 <br />SCHEDULE 2.0 - IRRIGATION REPAIRS - TOTAL <br />$2,951.38 <br />SCHEDULE 3.0 - BITUMINOUS CURB <br />1 SPEC EDGERTON TURN LANE BITUMINOUS CURB LF 210.00 $13.35 2,803.50 <br />SCHEDULE 3.0 • BITUMINOUS CURB - TOTAL $2,803.50 <br />SCHEDULE 4.0 - WINTER PREPARATION <br />1 SPEC BITUMINOUS RAMPING LS 1.00 $2,575.00 2,575.00 <br />2 SPEC TEMPORARY SEEDING PER LOAD 5.00 $622.50 3,112.50 <br />SCHEDULE 4.0 - WINTER PREPARATION - TOTAL 55,687.50 <br />SCHEDULE 5.0 - RECLAIM HAUL OUT <br />1 SPEC CREW TIME HR 4.50 $365.00 1,642.50 <br />2 SPEC TRUCKING HR 18.00 $105.00 1,890.00 <br />SCHEDULE 5,0 - HYDRANT LEAD ADJUSTMENT - TOTAL $3,532.50 <br />CHANGE ORDER #3 TOTAL $28,015.38 <br />7 <br />