Laserfiche WebLink
F�uR�hc AlSOa.aTtS <br />To: Schletty Drive Property Owners <br />From: Lee Elfering, City Engineer <br />Date: April 17, 2014 <br />RE: Revised Assessments Based On Low Bid Received <br />Proposed Project Award <br />The City has received bids on the 2014 Street and Trail Improvements project, which <br />included the work on Schletty Drive that was outlined at the Public Hearing earlier this <br />year. A total of six (6) bids were received and the total low bid for the project was <br />slightly below the final Engineer's estimate for the work. However, the costs for all <br />portions of the project were not all individually lower. As indicated at the Public <br />Hearing, City staff and Council wanted to inform you of the bid results and the affect of <br />the bids on the assessments prior to City Council action on award of the project. The <br />table below summarizes the project costs and assessments presented at the time of the <br />Public Hearing and those estimated based on the low bid received for the Schletty Drive <br />portion of the project. <br />As you can see the street portion of the project was slightly lower than estimated, but the <br />watermain cost was slightly higher. Please be aware that the street lighting was not part <br />of this bid, so we have utilized the original estimated cost in both columns of the table. <br />The street assessment was based on a rehabilitation of Schletty Drive with only minor <br />curb repair and was not significantly different from the original estimate; therefore we are <br />proposing that the street assessment remain the same. <br />The final page of this mailer contains a revised preliminary assessment roll similar to the <br />one presented at the Public Hearing. Additional columns have been added to the <br />assessment roll to reflect the results of the low bid received and the original estimated <br />2 <br />Public Hearing <br />Estimate Based on Low <br />Bid <br />Total Street Cost <br />$408,000.00 <br />$371,247.51 <br />Total Watermain Cost <br />$116,051.25 <br />$128,38125 <br />Total Lighting Cost <br />$17,250.00 <br />$17,250.00 <br />Assessable Street Cost <br />$120,000.00 <br />$120,000.00 <br />Assessable Watermain Cost <br />$85,511.45 <br />$94,596.71 <br />Assessable Lighting Cost <br />$17,250.00 <br />$17,250.00 <br />As you can see the street portion of the project was slightly lower than estimated, but the <br />watermain cost was slightly higher. Please be aware that the street lighting was not part <br />of this bid, so we have utilized the original estimated cost in both columns of the table. <br />The street assessment was based on a rehabilitation of Schletty Drive with only minor <br />curb repair and was not significantly different from the original estimate; therefore we are <br />proposing that the street assessment remain the same. <br />The final page of this mailer contains a revised preliminary assessment roll similar to the <br />one presented at the Public Hearing. Additional columns have been added to the <br />assessment roll to reflect the results of the low bid received and the original estimated <br />2 <br />