My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-07 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2007
>
04-11-07 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 1:21:09 PM
Creation date
4/23/2008 2:10:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />APRIL 11, 2007 <br />REPLACEMENT $72,050. The Administrator reported that Roof Spec, Inc. will handle the <br />construction management of this project. Roof Spec has reviewed the <br />bids. They reported that although they have not worked with All Systems <br />Roofing in awhile, they have worked with them in the past and have found <br />the company to be somewhat challenging to work with. This was <br />reviewed at length with Roof Spec, and based on the discussion there was <br />nothing found to warrant disqualification of All Systems Roofing's low <br />bid. <br />The Administrator reported that Roof Spec has had some discussions with <br />All Systems Roofing relative to the specs, and the roofing company has <br />been told that specs must be complied with and are not open for debate. <br />The Administrator reported that it will be Roof Spec's responsibility to <br />ensure the job is done well and according to spec. The Building Official <br />will also have some oversight on this project. <br />Mr. Blesener introduced the following resolution and moved its adoption: <br />RESOLUTION NO. 2007-4-90 -AWARDING THE LOW BID OFALL <br />SYSTEMS ROOFING IN THEAMOUNT OF $72,050 FOR THE FIRE <br />STATION ROOF REPLACEMENT PROJECT <br />The foregoing resolution was duly seconded by Allan. <br />Ayes (4). <br />Nays (0). Resolution declared adopted. <br />BOSS The City Administrator reviewed the City Engineer's report dated April <br />ROAD 11, 2007 relative to the Boss Road improvement. The report noted that <br />IMPROVEMENT the improvement includes the removal of a nonconforming cul-de-sac at <br />the end of Bryan Street. The Engineer recommended that the <br />improvement be expanded to include the removal as well as the <br />construction of a uniform street extension transitioning Bryan Street to <br />Boss Road. This will ensure proper drainage for the new street as well as <br />removal of the cul-de-sac, work which would be required of any developer <br />if the project were done privately. <br />The City Adminish•ator indicated that the benefiting property owners will <br />not want to pay additional street section that is not needed to gain access <br />to their property. The City Engineer's initial project estimate was <br />$76,100.00. Bids were opened on the 2007 Improvement Projects, and <br />result in assessable costs for Boss Road of $83,555.64 for the entire <br />project, and $76,782.08 if the Bryan Street portion is deleted from the <br />assessment. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.