My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
04/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:55:13 PM
Creation date
4/11/2016 8:53:19 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />April 4, 2016 <br />Page 2 <br />WETLANDS <br />1. The preliminary plat submittal shall include an approved wetland delineation and mitigation <br />plan as applicable. <br />ENVIRONMENTAL <br />1. The applicant shall provide documentation as to whether an Environmental Assessment <br />Worksheet (EAW) is required. <br />WATER SYSTEM <br />1. There is an existing watermain that runs through the site serving the City of North Oak's <br />Rapp farm development. This system will need to be relocated based on the current <br />proposed layout. <br />2. The City of Lino Lakes' existing water system is significantly north of the proposed <br />development and water service could be supplied from White Bear Township via a Joint <br />Powers Agreement until Lino Lakes' system is extended. <br />3. In conformance with the City's Comprehensive plan, a 12 inch watermain will need to loop <br />through the site making a north -south connection. <br />4. The water system interconnect with White Bear Township will be at the southeast corner of <br />the site. <br />SANITARY SEWER SYSTEM <br />1. There is an existing sanitary sewer forcemain (parallel to the watermain mentioned in #1 <br />above) that runs through the west side of the site and is pumped into a 10 inch gravity line. <br />This system currently serves the City of North Oak's Rapp farm development. This system <br />will need to be relocated based on the current proposed layout. <br />2. The property is within sewer District 4, which is proposed to be serviced by a White Bear <br />Township trunk sewer line. An 18 inch trunk sewer is located in the southeast corner of the <br />site. The City will need to work with White Bear Township to determine the appropriate <br />connection point to serve this property and the remainder of District 4. <br />3. A noted within the Comprehensive Sanitary Sewer Plan a Joint Powers Agreement with <br />White Bear Township will need to be in place for the sanitary sewer service. This agreement <br />will need to identify MCES SAC units and an associated fee structure. <br />TRANSPORTATION <br />1. The roadway alignment and profile shall meet MnDOT specifications for a 30 mph roadway <br />or the design speed. <br />2. The roadway typical section shall meet the City's standard. <br />3. The site needs to access into a public roadway. Wilkinson Lake Blvd is owned by <br />Presbyterian Homes of North Oaks which is a private roadway. To access this roadway will <br />require a public roadway easement obtained by the developer. <br />SACommunity Development\ProjectsTi nning Cases\Norfi Oaks Company PUD Concept Plan\Staff Repws\20160413 PZ (Concept Plan v2)\6 20160404 Memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.