My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
04/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:55:13 PM
Creation date
4/11/2016 8:53:19 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Per Sheet 23 of civil plans prepared by Carlson McCain revision date March 4, 2016: <br />Wetland Summary <br />Wetland Fill 167,677 s.f. <br />3.85 acres <br />Wetland Excavation <br />244,154 s.f. <br />5.61 acres <br />Total Wetland Impact <br />411,835 s.L <br />9.45 acres <br />Wetland Mitigation <br />657,678 s.f. <br />15.10 acres <br />Wetland Enhancement Area <br />211,766 s.f <br />4.86 acres <br />WMC Buffer Area <br />106,803 s.f <br />2.45 acres <br />WCA Buffer Area <br />469,920 s.f. <br />10.79 acres <br />Floodplain <br />FEMA updated the Anoka County Flood Insurance Study (FIS) and Flood Insurance <br />Rating Map (FIRM) on December 16, 2015. The DFIRM indicates a portion of Zone A <br />floodplain just south of Street B. The base flood elevation shall be determined by the <br />applicant. A Conditional Letter of Map Revision (CLOMR) and Letter of Map Revision <br />(LOMR) will need to be obtained from the Federal Emergency Management Agency <br />(FEMA) to verify the floodplain is not impacted by development. <br />Growth Management Policy <br />Per the Comprehensive Plan (page 3-27), an annual average of 230 units per year over <br />each 5 year phasing period not to exceed 345 units in any 1 year is allowed. At the end <br />of the 5 year phasing period unallocated units will be averaged out over the next 5 years. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.