Laserfiche WebLink
Ms. Katie Larsen <br />June 2, 2016 <br />Page 6 <br /> <br /> <br /> \\mspfsv02.lps.local\Studios\Active Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\From Others <br />(Original Data)\20160602 Engineering Review Lino Lakes United Properties.docx <br /> <br />4. Duplicate SAN MH3 numbering at 16+30 and 20+30. <br /> <br />STORM SEWER SYSTEM <br /> <br />1. Provide storm sewer calculations and drainage area maps with your construction plan <br />submittal to verify the size of pipes and spacing of catch basins. <br /> <br />2. The storm pipe diameters, pipe lengths, and pipe grades need to be shown in plan and <br />profile views. <br /> <br />3. The storm sewer is shallow throughout the project site. See City Standard Detail Plate <br />STR-2 and STR-10 regarding shallow pipe installation. <br /> <br />4. The arch pipe crossing the proposed roadway should be identified as 122-inch Span Arch <br />Pipe (this is the appropriate 96-inch diameter equivalent). 122-inch span arch apron on <br />either side will need to have sheet piled end section and trash guard. <br /> <br />5. Minimum structure depth is 3.5 feet within roadway to avoid frost heaving. Grout below <br />invert to provide sufficient depth. Following structures to be updated: 305, 203, 307, and <br />309x. <br /> <br />TRANSPORTATION <br /> <br />1. A Traffic Review was prepared by Spack Consulting, dated May 16, 2016. The following <br />comment/questions should be addressed. <br /> <br />• The original AUAR analyzed three land use scenarios. For the proposed United <br />Property site all three scenarios assumed the same land use. Based on the maps <br />(Figures 6-2,6-3 and 6-4) in the AUAR the site was split 50% industrial and 50% <br />commercial. The AUAR further defines that the floor area ratio (FAR) is .25 for <br />commercial and industrial uses (Table 6-2 in AUAR). Therefore, the size of <br />development assumed in the AUAR for this 30 acre site was 163,350 sf of <br />industrial and 163,500 sf of commercial. The traffic analysis in the AUAR <br />(Section 21, Table 21-1) defines the assumptions used for each land use. The <br />traffic generation for the proposed site should be compared with these uses and <br />assumptions. <br /> <br />• The AUAR made assumptions for future roadway improvements/connections (i.e. <br />extending 21st Avenue to Cedar Street, a connection between 20th Avenue (CSAH <br />54) and 21st Avenue via Center Street, and improving Cedar Street to 20th Avenue <br />(CSAH 54)). If these improvements are not being completed, the review should <br />be updated to include an analysis and discussion on the associated traffic <br />increases and traffic impacts at the critical intersections on either 20th Avenue <br />(CSAH 54) and/or Main Street (CSAH 14). <br />