My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
09/14/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 4:18:10 PM
Creation date
9/9/2016 2:41:44 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr��,,A <br />WSB <br />Building a legacy —your legacy. <br />Memorandum <br />To: Katie Larsen, City Planner <br />Kendra Lindahl, Landform <br />From: Diane Hankee PE, City Engineer <br />Date: September 7, 2016 <br />Re: Clearwater Creek Business Park (United Properties) <br />Plan Review <br />WSB Project No. 2988-200 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the Final Plat documents dated and submitted on August 11, 2016 and the <br />revised sheets C2.1, C2.2 dated August 28, 2016, for United Properties in Lino Lakes, MN <br />prepared by Plowe Engineering, Inc. The following are our review comments that should be <br />responded to in writing by the applicant. <br />GRADING, EROSION AND SEDIMENT CONTROL <br />1. The developer has submitted the NPDES Construction General Permit. <br />2. Verify that minimum drainage is achieved with the construction of the north parking lot. <br />STORMWATER MANAGEMENT <br />1. No additional comments. <br />FLOODPLAIN <br />1. A Letter of Map Revision (LOMR) is required for this project. <br />WETLANDS <br />The project will impact 0.3637 acres of wetland. A Wetland Replacement Plan and <br />supplemental information has been submitted to RCWD and the USACE for review. <br />Approval will be required prior to construction. The applicant shall provide a copy of the <br />wetland sequencing and mitigation plan to the City. <br />Equal Opportunity Employer <br />wsbeng.com <br />\\mspfsv02.lps.Imal\StudiosWaive Projects\CLL16009 - Clearwater Creek final PUD and final platTrom Others (Original Data)\2016-09-07 Engineering Review #3 United Properties.d— <br />
The URL can be used to link to this page
Your browser does not support the video tag.