My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-12-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
12-12-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:57:33 AM
Creation date
1/6/2017 1:32:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/12/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Engineering Planning Environmental Construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis, MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> <br /> <br />Minneapolis St. Cloud <br /> Equal Opportunity Employer <br /> <br /> <br /> <br /> <br />December 08, 2016 <br /> <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Request for Proposal to Complete 2017 Street Maintenance Project <br /> <br /> <br />Dear Mr. Grochala: <br /> <br />The City of Lino Lakes has an annual street maintenance plan which consists of mill and overlay <br />and seal coating. The City is requesting assistance with design and bidding of its 2017 Street <br />Maintenance Project. The streets designated for rehabilitation are local streets as determined by <br />their OCI ratings established in the City’s Pavement Management Study. A summary of the <br />project sites is described as follows: <br />Mill and Overlay <br /> <br />• 2nd Avenue (4550 LF) <br />• Glenview Avenue (450 LF) <br />• Parkview Drive (460 LF) <br />• Alternate Glenview Lane and Gladstone Circle <br /> <br />Sealcoat Areas <br /> <br />• Pine Glen <br />• Marshan Meadows/Grandview <br />• Woodridge Estates/Oakwood View <br />• Fox Borough <br />• Vaughn Addition <br /> <br />Based on the City’s existing street maintenance plan and discussions with staff, WSB would <br />perform the following tasks: <br /> <br />I. Prepare Final Project Plans/Maps <br />Final construction plans and/or maps will be prepared indicating the project <br />locations and any specific work to be done outside of the scheduled maintenance
The URL can be used to link to this page
Your browser does not support the video tag.