My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/12/1996 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1996
>
02/12/1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2017 12:46:06 PM
Creation date
6/23/2017 2:52:40 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/12/1996
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MEETING JANUARY 22,1996 <br />Ms. Dahl said that the City should seriously consider keeping the video tapes and the <br />Time Saver dictation because they put it on a hard disk and this is a permanent record. <br />This is done for the Planning and Zoning Board and Ms. Dahl said that she assumes that <br />the City still has this. Council Member Kuether said that the City Council talked about <br />having someone such as Time Savers do the City Council minutes but the City Clerk has <br />to be here. Mrs. Anderson explained that she is required to attend the Council meetings, <br />however someone such as Time Savers could actually do the minutes. Ms. Dahl said she <br />had talked to surrounding cities and they said that they could not believe that Lino Lakes <br />did not keep a permanent record by keeping the videos. <br />Amy Donlin, 6100 Centerville Road - Ms. Donlin said that she wanted to apply her <br />statement to both public hearings, Trapper's Crossing and Clearwater Creek <br />development. She noted that in considering these so called improvements, we often do <br />feasibility studies and pay amazing amounts of money to see just what has to be done to <br />bring our City up to par for development standards. Meanwhile, developers stand by and <br />dictate what they need and what they shall have and our residents often bear tremendous <br />burdens in terms of increased volumes of traffic throughout our City, students in our <br />schools, needs as far as police, fire and maintenance are concerned, increased incidents of <br />crime and violence and more often than not, increased tax burdens that all of this <br />necessitates. Ms. Donlin said she would like to offer up a term that has been lost in the <br />mad dash toward volumes of rooftops, the term is ethic. She said that ethic is a word that <br />means moral duty or obligation, the principles of conduct which govern us. She said that <br />ethics should be equally as important with feasibility reports and "bean" counting. Ms. <br />Donlin said that did not believe that residents should give up the quality of life which we <br />enjoy here nor should we have to pay dearly through esthetic depletion's, frontage <br />assessments or by way of state funding, which originates at home anyway, to make <br />developers projects profitable for them. She said she believes it is OK to draw the line <br />and to say no to a developments demands when it stands to drain our current residents in <br />any way. It is up to the developer to pull their weight and to pay for which benefits only <br />their pocket books. Ms. Donlin said she hoped you (the City Council) would do the <br />ethical thing and make he who demands the services also pay for them. <br />Kirk Corson, 6662 Ruffed Grouse Road - He explained that he worked for Hokanson <br />Development. He said that he felt that the City has a fine staff and felt that they try their <br />best to represent both sides of the issue. Even though he works for the developer, he <br />could see both sides of a lot of issues and felt the staff has tried to work with both sides. <br />Mr. Corson said he wanted to point out a few things about the traffic issue. First <br />Hokanson did pay for the traffic study. It was not paid by the City. Secondly, the traffic <br />study was completed in October, 1994 and the development agreement was signed in <br />July, 1995 not 1994 as previously stated. Mr. Corson, said that he went back through the <br />records of the minutes and looked at the video tapes of Council meetings. He said it was <br />our (Hokanson) understanding, based on what Darrell Schneider had worked out with <br />Hokanson, that the project (road improvement) would be $1,900,000.00. There were <br />funds that should be allocated from Brandywood, Hokanson's cost would be $250,000.00 <br />PAGE 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.