My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/27/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
02/27/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 12:00:04 PM
Creation date
7/7/2017 2:51:02 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/27/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB -24-199 11:A8 NAC <br />612 595 9837 P.03/03 <br />-t$aviatig r repleted th aoorern nt n ed c,4.idie.. our ,r.f .+n +-+.coairn. nds approval ....vi e,Y <br />«ux q.�.'cxa the wa LviaLVUWVI.a�a ucitaaalNw� Lu1 vial+,.v lyy�/A �ylu Vi L4Ji! Q�/I.11LlY Ql of the 1GbLp+.rlj <br />Clearwater Creek preliminary plat dated 8 February 1995 subject <br />et(.CP the following conditions: <br />1, The City approve the requested rezoning of the subject property from R, Rural to an R- <br />1, Single Fancily Residential zoning designation. <br />2. A landscape plan is submitted which illustrates the screening of lots that abut either Otter <br />Lake Road or Cedar Street. <br />3. The following precautions are taken in the event that adjacent southerly development does <br />not occur in the immediate Mum. <br />a. Those lots west of Street A which receive access from Street. 11 be excluded fivui <br />the subject plat at this time and be developed as a future phase in conjunction <br />with future southerly development. <br />b. <br />Provision is made to provide a possible Street. E loop within the boundaries of the <br />subject site. <br />4. A temporary cul-de-sac is provided at the southern terminus of Street A. <br />5. The City Engineer provide cominentlrecornmendation in regard to street width <br />requirements. <br />6.A,nl ac sspnermit is obtained from Anoka County Highway to accommodate propose; <br />County Ro(tad. access. <br />64 <br />7. The submitted grading and drainage plan is subject to review and approval by the City <br />Engineer. <br />8. The submitted utility plan is subject to review and approval by the City Engineer. <br />9. Park land dedication, as recommended by the Park Board and depicted upon the revised <br />plat, is formally dedicated to the City. <br />10. All wetland related recommendations offered by the Army Corps of Engineers. Rice <br />Creek Watershed District, and City Engineer are satisfactorily met. <br />11. The submitted phasing plan is subject to City approval. <br />13 <br />0 <br />TOTAL P.073 <br />
The URL can be used to link to this page
Your browser does not support the video tag.