My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-24-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
04-24-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:48:20 PM
Creation date
3/14/2018 12:10:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/24/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />6 TBD <br />7 TBD <br />8 TBD <br />TOTAL 172 <br /> TOTAL SF Lots in NP = 215 <br />- # Lots Platted to Date = 172 <br /># Lots Remaining1 = 43 <br /> <br />1The # Lots Remaining does not include the potential 88 unit multi-family senior complex proposed in the <br />southeast corner of the development. <br /> <br />Blocks and Lots <br /> <br />The final plat for NorthPointe 5th Addition creates 39 lots and 4 outlots. Outlots A and D are <br />for future development. Outlots B and C are stormwater management and wetland protection <br />areas. <br /> <br />Outlot B, NorthPointe 4th Addition and Outlot C, NorthPointe 5th Addition will be deeded to the <br />City after all construction, utilities, lift station, restoration and as-builts have been completed in <br />the outlots and approved by the City Engineer. <br /> <br />Streets <br /> <br />The following right-of-way and street widths were approved with Resolution No. 14-21, PUD <br />Development Stage Plan/Preliminary Plat: <br /> <br />Street Name Right-of-Way Width Street Width <br />(Back to Back) <br />Chestnut Street 60 feet 32 feet <br />Rosewood Street 60 feet 32 feet <br />Dogwood Street 50 feet 28 feet <br /> <br />A 5 foot wide concrete sidewalk will be constructed along Chestnut Street and connect with <br />existing sidewalk along Cypress Street and 21st Avenue S. as approved in the PUD <br />Development Stage Plan/Preliminary Plat. No sidewalk is required along Rosewood or <br />Dogwood Street. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.