Laserfiche WebLink
City of Lino Lakes – West Shadow Lake & LaMotte Street & Utility Improvement Projects – Proposal for Final Design <br />August 4, 2017 <br />Page 5 <br /> <br />K:\02988-450\Admin\Contract\Final Design - Proposal\2017-07-12 LL Shadow Lks & LaMotte - Proposal for Final Design - Final.docx <br />Studies Phase 1A and Phase 1 Archaeological and Architectural Surveys). A subconsultant <br />has provided a quote to complete the required this scope of work. <br /> <br /> AutoCAD Base Mapping (Pete H., Jim S) <br />Create a parcel base map for the entire project area using existing found monuments that <br />would be located during Task 1 coupled with plats and half section maps of record from <br />the county surveyors office, this map would also be used in the right of way acquisition <br />process for creating parcel sketches and legal descriptions. <br /> <br />II. Final Design & Permitting <br />The scope of services for this phase will further the design of the project including the <br />creation of a full set of plans of the proposed improvements, coordination with private <br />utility companies, right of way acquisition, and the Chapter 429 special assessment <br />process. WSB will assist the City in obtaining approvals from governmental authorities <br />having jurisdiction over the project if it is determined that they are needed including the <br />preparation of permit application(s) and/or approval requests and will assist the City with <br />submitting the applications/approval requests to the appropriate regulatory agencies. <br />This phase will be separated into two separate projects, final design/permitting for the <br />West Shadow Lake Culvert Replacement Project and the West Shadow Lake & LaMotte <br />Areas Street & Utility Improvement Project. It has been assumed separate plans, <br />specifications, and bidding documents will be prepared. <br /> <br /> Private utility coordination (Jim S): <br />Private utility coordination will be conducted to ensure that all parties with facilities in <br />the project area are notified of proposed City project improvement, scheduling, proposed <br />private utility installations, and possible impacts. This task includes one coordination <br />meeting with affected utility companies, preparation of meeting minutes, and continued <br />coordination and communications throughout the design process. <br /> <br /> Stormwater BMP’s and permitting (Katy T): <br />The proposed level of disturbance will require permanent stormwater management best <br />management practices (BMPs), as well as floodplain and wetland fill. Permitting will be <br />required through the Rice Creek Watershed District, as well as the MPCA through the <br />NPDES permit application process, the Minnesota Department of Natural Resources, and <br />the U.S. Army Corps of Engineers. These services include the necessary stormwater, <br />floodplain and water quality modeling, stormwater BMP design, plan preparation, permit <br />applications, and coordination with the appropriate governing authorities. <br /> <br /> West Shadow Stormwater Lift Station and/or Underground Storage (Erin H and Katy T): <br />Should a stormwater lift station or underground storage be determined necessary for <br />obtaining permits for the West Shadow reconstruction work, WSB will create full plans <br />and specifications for a City-owned stormwater lift station. The design will incorporate <br />City and industry design standards for the wet well, valve vault, pumps, and forcemain <br />system as well as the control panel and electrical system. WSB will coordinate with Xcel <br />Energy to determine the available power supply, and will adjust pump and VFD design as <br />needed. The anticipated capacity for the stormwater lift station will be dependent on the <br />contributing drainage area and will be determined, if needed, during final design. <br /> <br />Right of way and easement acquisition (Ben B):