Laserfiche WebLink
As the table indicates, the low end cost for a small addition of a scope that still allows for efficient <br />construction costs represents a construction cost of $1.65 million for a low -temperature heated open <br />plan storage addition. Conversely, if the population and equipment growth projections hit their most <br />aggressive levels represented in this study, the maximum addition cost would range from $3.3 million to <br />a high end of $4.5 million. As noted, these construction estimates are based on recent construction <br />costs for Public Works facilities of similar types and are listed in 2017 dollars. <br />Thank you for the opportunity to provide this additional data to better explain the study methodology <br />and the intended limitations of the future expansion cost ranges. <br />Best Regards <br />Quinn Hutson, AIA, LEED AP <br />Principal <br />CNH Architects, Inc. <br />CNH <br />ARCHITECTS <br />