My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-04-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
02-04-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 9:36:00 AM
Creation date
2/1/2019 3:40:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/04/2019
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As the table indicates, the low end cost for a small addition of a scope that still allows for efficient <br />construction costs represents a construction cost of $1.65 million for a low -temperature heated open <br />plan storage addition. Conversely, if the population and equipment growth projections hit their most <br />aggressive levels represented in this study, the maximum addition cost would range from $3.3 million to <br />a high end of $4.5 million. As noted, these construction estimates are based on recent construction <br />costs for Public Works facilities of similar types and are listed in 2017 dollars. <br />Thank you for the opportunity to provide this additional data to better explain the study methodology <br />and the intended limitations of the future expansion cost ranges. <br />Best Regards <br />Quinn Hutson, AIA, LEED AP <br />Principal <br />CNH Architects, Inc. <br />CNH <br />ARCHITECTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.