My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-04-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
03-04-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
2/28/2019 4:17:16 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/04/2019
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />• The quantity of development of the area will be limited to ensure that traffic <br />generation does not exceed the capacities of Hodgson Road, the intersection with Co <br />Rd J, or the new access. Development shall not create the need for a traffic signal at <br />the new full access on Hodgson Road. <br /> <br />o Planning for the area must look forward to full development of the study <br />area so as not to allow one project to “use up capacity” so that other sites <br />cannot develop without creating the need for a signal at the new access. <br /> <br />As noted, a traffic analysis was completed for the development. Peak trip generation <br />from the proposed development is approximately 1/3 of the trip generation provided for <br />in the Master Plan. No signal is proposed at the new full access. <br /> <br />• Right of way will be dedicated with development to ensure adequate right of way for <br />Hodgson and CR J as well as for the internal circulation system, as necessary. <br /> <br />The preliminary plat dedicates additional right-of-way ranging from 27 feet to 42 feet <br />along CSAH 49 (Hodgson Road) creating 60 feet to 75 feet of dedicated right-of-way <br />from section line and/or roadway centerline. <br /> <br />The preliminary plat also dedicates an additional 10 feet of right-of-way along CR J (Ash <br />Street) to provide a full 60 feet from section line. <br /> <br />The internal public road is dedicated with 60 feet of right-of-way. <br /> <br />Overall, the proposed development is consistent with the Transportation and Access goals <br />of the Master Plan. <br /> <br />Trails, Open Space <br /> <br />• A trail connection, included as an ‘enhancement corridor’ in the Parks, Natural Open <br />Space/Greenways and Trail System Plan, will be established across the study area. <br />This will link to the existing trail connection to Woodridge Lane on the west, cross <br />through the study area, and link to a future trail in Ware Road. The specific <br />alignment of this trail corridor across the Master Plan area will be determined as <br />development occurs. <br /> <br />The Lyngblomsten site plan includes an 8 foot wide trail/walk that extends from the <br />existing Woodridge Lane trail to the private road then tapering to a 5 foot wide walk to <br />the club house to the internal public road and sidewalk. This trail connection shall be <br />revised to a full 8.5 foot width trail within a 20 foot wide corridor easement. The section <br />of sidewalk along the internal public road shall be 8.5 feet and connect to Hodgson Road. <br /> <br />• An, open, focal point green space is to be created where the Woodridge Lane trail <br />connection enters the study area. The specific design of this focal point will be <br />reviewed with any development application for the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.