My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-03-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
06-03-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
6/4/2019 11:32:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/03/2019
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5/29/2019 18 <br /> <br /> <br />Foxborough conservation area maintenance is funded by the endowment held by the <br />City and HOA dues. Ensure dollars are received from association in January. <br /> <br />The Preserve conservation area maintenance is funded by HOA dues. Monitor the <br />Preserve funds for project management. <br />NR2.3 Wetland Banking and Habitat Restoration <br /> The City owns two (2) wetland banks; Wollan Park (BWSR Bank Acct. 1122) and <br />Otter Lake Road (BWSR Bank Acct. 1601). Existing banks require ongoing <br />management in accordance with the banking approvals. A percentage of bank sales is <br />set aside to maintain restoration efforts. <br /> <br />Opportunities to restore or protect habitat will surface frequently in development <br />projects. This is done through development agreement, City/RCWD rules for <br />buffering, and the development of wetland management corridors. <br /> <br />Requirements for initiating a new wetland bank can be found online through the <br />BWSR website. It is standard practice to develop a budget up front in relation to a <br />restoration plan. Set a budget and expect everyone to stick to it; however, anything <br />can happen with restoration techniques and adaptability (budget contingency) is also <br />important. <br /> <br />Wetland banking/Restoration requires the removal of Reed Canary thatch. Timing is <br />critical and the process is very adaptive. The ideal time is when the thatch layer is <br />thawing out in the spring before subsoils/muck thaws and when a track-type unit can <br />get on the wetland and skin or cut out the reed canary thatch. Mucky soils underneath <br />must be frozen while the thatch is thawed. Most of the time there is about a 1 to 2 <br />week window of opportunity to do this. Tracking closely is necessary. <br /> <br />Train a public works employee/equipment operator to get familiar with process (with <br />the approval of the Public Services Director). There is a definite “feel” to being on a <br />frozen wetland that is rapidly thawing from the top down. <br /> <br />Wetland banking and restoration will also involve the use of herbicides or grass <br />killers. Timing and the right chemical is important. <br /> <br />Control all volunteer woody plants that move in, unless they are desired. Oaks will <br />sometimes come in and won’t move around – Oaks are ok. <br /> <br />Answer questions to perspective credit buyers. Facilitate sale based on agreed upon <br />prices with Community Development Director. All sales subject to City Council <br />approval. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.