Laserfiche WebLink
Mr. Michael Grochala <br />March 20, 2019 <br />Page 2 <br />K:\02029-870\Admin\Contract\20190318 Design Fee Proposal.docx <br />The scope of services for this phase includes gathering the necessary data and <br />performing field documentation activities to complete the final design of the project. The <br />information gathered will be used to develop an accurate AutoCAD base map and <br />document current conditions in the field. The following is a detailed list of the work tasks <br />to be performed. <br /> <br />a. Project Management <br />WSB will lead the project design process including communication and coordination <br />efforts to facilitate the design and biding of the proposed project. WSB will hold <br />project meetings with the City of Lino Lakes or other governing entities during final <br />design. We will provide the necessary graphics, maps, and presentation materials for <br />these meetings. In addition, email correspondence, conference calls, and other <br />related day-to-day communications techniques will be used. <br /> <br />b. Topographic Survey <br />i. Collect, review and establish survey control points necessary to perform <br />topographic survey along the project length. Iron monuments (property corners) <br />will be used as control whenever possible. Survey control points will be located <br />such that will not be disturbed by construction. There will be enough control <br />points throughout the project to allow for staking during construction. Each <br />control point will be visible from minimum of two other control points. The control <br />points will be within an error tolerance of 0.03 feet or better for X,Y,Z. <br />ii. Perform topographic survey along the project corridor using total station <br />equipment. <br />iii. The extents of the survey will be 15 feet beyond the right of way, the locations of <br />the existing wells will be included in this Survey, the survey will continue around <br />radius of intersections at the project limits. Trees include additional information, <br />such as size and type. All possible property irons will be located. First floor or <br />garage floor elevations will be collected as a part of the topographic survey. <br />iv. Use topography survey data to develop an existing conditions base map. <br />v. The base map will include the survey points, line work (as survey figures where <br />applicable), and existing ground surface. <br />vi. Data pertaining to the city’s storm sewer, sanitary sewer, and water main shall be <br />collected in the field. This data includes rim elevations, invert elevations, pipe <br />sizes, and structure sizes. <br />vii. Private and other utilities (gas, telephone, electric, cable, etc.) data will be <br />collected with design level locates. <br />viii. It has been assumed that the City will provide record plan information or any <br />existing plat information for incorporation into the AutoCAD base-map and TIN. <br />Once the project is complete, WSB will provide the City with the electronic files <br />used on the project. Any additional survey requested by the City, or what may be <br />needed due to changes in scope, or schedule, will require a re-evaluation of this <br />service fee. <br /> <br />c. Private Utility Plan Review & Integration <br />A Gopher State One Call will be initiated to request field markings and mapping of <br />the existing private utilities within the project area. This information will be reviewed <br />and with what was obtained with the survey in the field. <br /> <br />d. Road Cores & Geotechnical Evaluation <br />We propose to complete necessary road coring along East Cedar Street to establish <br />existing pavement and base depths necessary for reclaiming. <br />