My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-12-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
11-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
1/16/2020 10:21:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/12/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> <br />Streets and Alleys <br /> <br />Both lots are served by West Shadow Lake Road which is being reconstructed and municipal <br />water and sanitary sewer is being installed. The existing road has 60 feet of right-of-way and <br />the paved road surface is 26 feet wide with ribbon curb. <br /> <br />Easements <br /> <br />Standard drainage and utility easements at least 5 and 10 feet wide are provided along all lot <br />lines. The wetland and stormwater basin shall be covered by an easement that includes a 10 <br />foot buffer. <br /> <br />Storm Water Management and Erosion and Sediment Control <br /> <br />Per the Site Drainage Narrative prepared by Plow Engineering, Inc. dated July 1, 2019, there <br />are 3 areas of discharge from the site (one to the north and 2 to the east). The existing fire pit <br />will be removed and a small basin will be constructed in the area adjacent to the fire pit. Per <br />WSB Engineering letter dated September 24, 2019, new impervious area from the site is all <br />routed to the east towards Reshanau Lake. The new impervious surface is less than 10,000 <br />square feet, and all runoff from new impervious will run over a pervious surface prior to <br />leaving the site, therefore no water quality treatment will be required as a result of the <br />additional impervious surface from the single-family residential development. Side yard <br />drainage ways are required. <br /> <br />Utilities <br /> <br />Sanitary Sewer <br /> <br />A 3” sanitary sewer force main is being installed along West Shadow Lake Drive. The existing <br />house shall hook up upon availability. The new house shall hook-up upon construction. The <br />existing septic drain field shall be removed. <br /> <br />Watermain <br /> <br />An 8” DIP watermain is being installed along West Shadow Lake Drive. The existing house <br />shall hook up upon availability. The new house shall hook-up upon construction. The existing <br />well may be used for irrigation only or shall be properly capped and abandoned. <br /> <br />Public Land Dedication <br /> <br />The City will require cash in lieu of land dedication for the new lot. The lot with the existing <br />house will not be charged a park dedication fee. <br /> <br />Park Dedication Fees <br />Total # of Lots = 1 <br />x 2019 Park Dedication Fee $3,000
The URL can be used to link to this page
Your browser does not support the video tag.