My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/11/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
03/11/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:26:59 PM
Creation date
3/6/2020 8:34:06 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/11/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />03/04/2020 <br />Page 3 <br />The proposed roadways are consistent with preliminary plat. The work in this addition <br />includes extending the Crane Drive, Watermark Way, Bay Drive, Ada Drive, and Gull <br />Drive. Crane Drive, Johanna Circle, Itasca Circle, and Balsam Way are proposed to be <br />32' wide from back -of -curb to back -of -curb, Ada Drive and Gull Drive are proposed to <br />be 28' wide from back -of -curb to back -of -curb, and Bay Drive, Heron Court, Island <br />Court, and Jasper Court are proposed to be 24' wide from back -of -curb to back -of - <br />curb. There are no comments at this time. <br />• Wetlands and Mitigation Plan <br />Wetlands and mitigation plan reviewed during the Preliminary Plat. <br />• Landscaping <br />The Watermark 3rd Addition Site Landscape Plan has been reviewed by staff and is <br />consistent with the PUD Development Stage Landscaping Plan. The Environmental <br />Coordinator Memo dated February 27, 2020 notes some minor comments such as seed mix <br />types, clear vision areas and planting details. <br />Comments: <br />1. Trees shall not be placed over utility pipes. Please move trees 20-ft from proposed <br />utility lines. <br />2. Trees shall not be placed over proposed water or sanitary services, including curb <br />stops and clean outs. <br />3. Coniferous trees shall be 10-ft from trail edges. Deciduous trees shall be 15-ft from <br />trail edges <br />• Geotechnical <br />No comments at this time. <br />• Floodplain <br />The Watermark 3rd Addition does impact the existing floodplain. <br />• Drainage and Utility Easements <br />Roadways are proposed within right-of-way and lots include standard drainage and utility <br />easements. Larger drainage and utility easements are provided over surface water <br />management features as required. <br />• Development Agreement <br />A development agreement will be required with the final plat. <br />• Grading Agreement <br />A Grading and Trunk Utility agreement was completed for Phase 1 of the Grading, <br />Development & Erosion Control. The Watermark 3rd Addition is within the Phase 1 <br />grading limits. <br />Watermark 3' Addition Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.