Laserfiche WebLink
See excerpt from Mn/DOT seeding manual for maintenance plan, and Mn <br />DNR Shoreline Alterations: Natural Buffers and Lakescaping publication for <br />tips. <br />should[h;erhe come way to legally ensL ire the riparian buffer stays as a <br />Tpa eft for the property if the lets are sew The preliminary plat and/or <br />final plat resolutions will be recorded against the property noting the buffer <br />requirement. <br />5. There is a proposed 0.19 acres of land disturbance. An erosion control plan is <br />required <br />Erosion control/Revegetation specs item #3 on the Preliminary Grading, <br />Drainage, and Erosion Control Plan calls for native topsoil, seed, and mulch <br />anchored within 14 days after rough grading. Being that Reshanau Lake is an <br />impaired water, these steps should be completed within 7 days after rough <br />grading. <br />6. One Boulevard tree should he planted on the new narGet Per 11-12-19 <br />Council staff report, Lot 1 and Lot 2 contain existing trees in the front yard that <br />serve as boulevard trees. No additional boulevard trees are required. <br />7. All trees to be preserved must be protected with fencing extended out to the <br />driplines of the trees. <br />Ensure that silt fence for the Tree Protection Zone is installed prior to <br />construction/grading activities and that equipment associated with these <br />activities is not operated between the fence and the trees at any time. The <br />fence may have to be relocated from what is shown on the plan to allow for <br />work related to the Basin/FEMA mitigation area. <br />0 Page 2 <br />