My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/29/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
04/29/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:57:26 PM
Creation date
4/24/2020 11:18:56 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/29/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2 shows the studied land uses. <br />Revised Scenario 2 <br />This scenario has higher residential and commercial land use, with less industrial than Revised <br />Scenario 1. It is still within the assumptions of the original AUAR. Table 1 provides a summary of <br />this uses for this scenario. Figure 3 shows the studied land uses. <br />2030 Comprehensive Plan <br />To address comments obtained during the AUAR Update comment period, the current 2030 <br />Comprehensive Plan scenario has been included. This scenario is in conformance with the <br />currently approved Comprehensive Plan. It is the lowest in terms of residential development, has <br />slightly less commercial development, and similar industrial development anticipated to the other <br />two scenarios. Figure 4 shows the 2030 Comprehensive Plan land use. <br />Table 1: Summary of 2005 and 2020 AUAR Scenarios <br />Land Use <br />2005 AUAR Scenarios <br />Old Scenarios <br />2020 Scenarios <br />Revised Scenarios <br />Scenario 1 <br />Revised Scenario 1 <br />Residential units <br />2,237 <br />4,888 <br />Commercial sf <br />2,985,733 <br />5,084,819 <br />Industrial sf <br />11,175,035 <br />12,817,289 <br />Scenario 2 <br />Revised Scenario 2 <br />Residential units <br />5,715 <br />7,403 <br />Commercial sf <br />5,617,890 <br />5,306,914 <br />Industrial sf <br />9,570,045 <br />10,053,499 <br />Scenario 3 <br />2030 Comprehensive Plan <br />Residential units <br />8,659 <br />2,455 <br />Commercial sf <br />4,141,554 <br />3,228,667 <br />Industrial sf <br />5,829,722 <br />10,128,296 <br />Development timing is dependent on market conditions and is anticipated to continue over the next 5- <br />40 years. Some development has occurred within the study area as shown in Figure 5. <br />Planned Infrastructure <br />Development in the study area will require infrastructure improvements. The analysis for the <br />stormwater, water, wastewater, and traffic have been updated as part of this AUAR Update to <br />evaluate the revised scenarios. These analyses are included in the appendices. <br />Stormwater: The stormwater analysis was updated based on the revised development <br />scenarios. Additionally, rules and regulations have changed over the years regarding stormwater <br />management in the study area since the original AUAR was completed. Stormwater will be <br />required to be managed based on local, regional, and state water resource rules. The updated <br />analysis indicates that runoff volumes will be reduced by approximately 70% compared to existing <br />conditions based on implementation of stormwater management controls. This will also reduce <br />downstream pollutant loading. Appendix B contains the stormwater management analysis. <br />1-35E Corridor AUAR Update <br />April 15, 2020 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.