Laserfiche WebLink
Comprehensive Plan <br />Resource Management System <br />The Resource Management System Plan goal of preserving surface water quality is <br />supported by the construction of stormwater management BMP's such as curb, gutter and <br />NURP pond. <br />Land Use Plan <br />The Comprehensive Plan guides this property for industrial use. The proposed LTC <br />campus expansion project is consistent with industrial land use. <br />Housing Plan <br />The goals and policies of Housing Plan are not negatively impacted by the proposed LTC <br />campus expansion project. <br />Transportation Plan <br />Goals of the Transportation Plan are to ensure that street and roads are as safe as possible. <br />CSAH 14 (Main Street) is an A -Minor Arterial Connector Road and is capable of <br />handling the additional traffic volume proposed by the LTC campus expansion project. <br />The driveway to Victor Path is for weekly truck deliveries and emergency access. <br />Sanitary Sewer and Water Supply Plan <br />An 8" sanitary sewer main and 8" watermain along CSAH 14 (Main Street) provide <br />public utilities to the site and building. The sanitary sewer and water supply system have <br />capacity for the LTC campus expansion project. <br />Anoka County Highway Department <br />Staff distributed materials to Anoka County Highway Department but has not received <br />any comments yet. We do not anticipate any issues since this is an existing access onto an <br />arterial connector road. <br />Public Safety Comments <br />The Fire Division reviewed the proposed campus, parking lot and driveway expansion. <br />They commented that the east driveway needs to be able to support fire trucks and <br />emergency vehicles. <br />The Police Division reviewed the plans and had no issues that needed to be addressed. <br />10 <br />