My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/10/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
11/10/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:14:01 PM
Creation date
11/5/2020 3:51:26 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/10/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Requirements <br />At the time of building permit, the single family house proposed on Lot 2 will be <br />reviewed for compliance regarding floor area, garage and design and construction <br />standards. <br />Subdivision Ordinance <br />The underlying plat is Lot 24, Auditor's Subdivision No. 151 that was platted in 1953. <br />Conformity with the Comprehensive Plan and Zoning Code <br />The preliminary plat is consistent with the comprehensive plan for low density residential <br />development and zoning code requirements for R-1, Single Family Residential as <br />discussed above. <br />Blocks and Lots <br />The preliminary plat contains Lot 1 and Lot 2, Block 1, Bald Eagle Addition. As noted <br />above, Lot 1 contains the existing house and Lot 2 proposes a new single family home. <br />Streets and Alleys <br />Lot 1 is served by Elm Street which is a major collector road. The existing road right-of- <br />way width is 66 ft. Section 302.03(1)(a) requires 80ft of road right-of-way width. An <br />addition seven (7) ft of road right-of-way shall be dedicated on the plat. <br />Lot 2 is served by Second Avenue which is also a major collector road requiring 80 ft of <br />road right-of-way width. The existing road right-of-way width is 80 ft. No addition <br />right-of-way is required. <br />Easements <br />Drainage and utility easements at least ten (10) feet wide are required and shown along <br />all lot lines. <br />Storm Water Management and Erosion and Sediment Control <br />Per the City Engineer's memo dated October 29, 2020, the Bald Eagle Addition includes <br />site grading for the proposed house pad on Lot 2 and minimal site grading. Because the <br />new impervious surface of 4,393 sf is less than 10,000 sf, the project does not require <br />Stormwater Management. However, staff has reviewed the drainage in this area and is <br />concerned that the proposed Lot 2 will direct more water towards adjacent properties and <br />trap water near the eastern property line as the area is flat and landlocked. The drainage <br />along the south property line of Lot 2 is shown to be directed to the northwest (rear of the <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.