Laserfiche WebLink
5 <br />The preliminary plat contains 68 single family lots and 6 outlots. The 2nd Addition final <br />plat consists of 33 single family lots and 1 outlot. The final plat outlot is for the <br />following purposes: <br /> <br />Outlot Purpose Ownership <br />A Trail Corridor City <br /> <br />On the original preliminary plat, Outlot D contained NSP easement and storm sewer pipe. <br />To minimize the City’s responsibility of mowing and maintaining manicured grass in this <br />area, the outlot has been omitted and the lot lines extended through the NSP easement. <br /> <br />Outlot A will be deeded to the City for ownership and maintenance. <br /> <br />Streets and Alleys <br /> <br />Internal road right-of-way widths are 60 feet and the paved roadway width is 32 feet back <br />to back. This is consistent with the City’s engineering standards. Cul de sac paved <br />widths have been revised to 32 feet back to back. <br /> <br />CSAH 54 (20th Avenue) is classified as an A-Minor Arterial Reliever and requires a full <br />120 feet of dedicated road right-of-way. The plat dedicates 60 feet of road right-of-way <br />from section line as required. Turn lane plans were approved by Anoka County Highway <br />Department with the 1st Addition. <br /> <br />CSAH 34 (Birch Street) is classified as a Major Collector road along the section of the <br />proposed development and requires a full 80 feet of road dedicated right-of-way. The <br />section of the plat that abuts CSAH 34 (Birch Street) previously dedicated 60 feet of road <br />right-of-way. No further road right-of-way is required. <br /> <br />The length of Red Oak Lane cul de sac is 250 ft and Norma Way is 350ft. No permanent <br />cul de sac length exceeds 500 feet as required by ordinance. Length requirements do not <br />apply to temporary cul de sacs such as William Lane. <br /> <br />A temporary cul de sac and easement are shown on the west end of William Lane. A <br />separate recordable easement document shall be recorded against the property and shall <br />be terminated upon extension of William Lane. The future developer will be responsible <br />for removal of the temporary cul de sac and restoration of the lot. <br /> <br />The temporary cul de sac at the south end of Heritage Avenue constructed during Phase 1 <br />will be removed. <br /> <br />William Lane road right-of-way and utilities will be extended to the westerly property <br />line consistent with standard subdivision and engineering design practice. Barricades and <br />“Future Road Extension” signs are also provided at the west end of William Lane. <br />