My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/03/1994 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1994 Park Board Packets
>
10/03/1994 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:41:43 PM
Creation date
6/4/2021 3:04:14 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/03/1994
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S5P-2871'994 0?:49 NAC 612 595 983? 0.08i08 <br /> TRAIL COSTS <br /> In addition to a household distribution breakdown, calculation of <br /> new MPTWs and sidewalks must be derived. From such a calculation, <br /> a cost per linear foot may be applied to. determine trail costs. <br /> TRAIL COSTS <br /> Linear Feet Cost/Foot Total <br /> Within 2610 MUSA: <br /> MPTWs 340,900 $ 9 $ 3, 068, 100 <br /> Sidewalks* 40, 800 $11 448, 800 <br /> Sub--Total $ 3, 516,900 <br /> Outside 2010 MUSA: <br /> MPTWs 172, 500 $ 9 $ 1,552, 500 <br /> Sidewalks -- - $11 -- - <br /> Sub-Total 172,500 $ 1,552,500 <br /> Total for City: <br /> MPTWs 550,400 $ 9 $ 4, 648, 600 <br /> Sidewalks 61, 800 $11 448, 800 <br /> n <br /> TOTAL $ 51097,400 <br /> * Does not include CBD sidewalks <br /> NOTES: o Cost estimates for MPTWs and sidewalks provided by <br /> Lakeville Engineering Department and represent 1992 <br /> costs. <br /> o Linear foot allocations apply only to new trails. <br /> 2 <br /> TOTAL P.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.