Laserfiche WebLink
PARK BOARD MINUTES October 3 , 1988 <br /> 4) Board did not want the additional 6' of walkway <br /> on the street connecting Deerwood and Red Fox <br /> Lane. <br /> Chairman Ray Johnson recommends deleting the pond from the <br /> final park dedication plan. Upon deletion, final park <br /> dedication will be approved. <br /> RICE LAKE ESTATES PARK/UPDATE <br /> Don Volk states that lot 1 and 2 have not yet been obtained, <br /> nor the $40, 000 Park dedication fee paid. The city is in <br /> the process of taking the necessary action, to assure park <br /> dedication will take place. <br /> 1988 Budget Improvement $8, 000. 00 <br /> Don Volk suggested the $8,000. 00 be spent on one of the <br /> following ways: <br /> 1) D. Ericksons 2nd Addition - preliminary work <br /> on grading, seeding, and top soil as necessary. <br /> 2) Sunrise Park - irrigating for underground <br /> sprinkling system. <br /> Don is in favor of the 2nd option. The park will be going <br /> through a reallignment of ballfields, therefore, it would be <br /> an excellent time to install the sprinkling system. <br /> To irrigate the ballfield alone would be about $7, 000. The <br /> material that is used is a heavy ABS plastic, which will <br /> withstand freezing and shifting of land. <br /> The cost will be approximately $24,000 to irrigate all of <br /> Sunrise Park. <br /> Don will obtain material quotes, and proceed with <br /> installation. <br /> OLD BUSINESS <br /> 1. OPINION SURVEY: The Park Board has taken several steps <br /> towards giving the people of our city what they want in a <br /> park system. Reshanau Lake Estates is a good example of <br /> this, with ballfields and bike and walking trails. <br /> n <br /> Page 4 <br />