My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/07/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1998 Park Board Packets
>
12/07/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 4:03:52 PM
Creation date
7/23/2021 9:37:12 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
12/07/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes <br /> Park Board Meeting <br /> November 2, 1998 <br /> The City will provide the following: <br /> 1 . Street sweeping of Ivy Ridge Court and Ivy Ridge Lane, where <br /> trail easements exist, two (2) times per year with <br /> additional sweeping at the discretion of City staff . <br /> 2 . Provide trail signage indicating "No Motorized Vehicles <br /> Allowed" . <br /> 3 . Provide split rail fence along the southern property line of <br /> Lot 31 . <br /> 4 . Construct the bridge . <br /> 5 . Pave remaining trail segments . <br /> Rick indicated that if this agreement is executed, he may <br /> anticipate design of the bridge to occur this winter with <br /> construction to begin in the spring of 1999 . Trail paving would <br /> be done along with other trail work in 1999 . <br /> Rick noted the cost estimate is $4, 300 for pre-cast concrete <br /> slabs . He stated he would like to look into a prefabricated <br /> bridge which would cost more. The cost estimate for the trail <br /> construction is $7, 000 . There is $11, 400 remaining in the park <br /> dedication fund for this project . Rick indicated that if the <br /> agreement is acceptable the Association would like a clear <br /> timeline regarding the project . The association is assuming the <br /> bridge and trail will be done in 1999 . <br /> Chair Lindy indicated he thought there was more that $11, 400 <br /> dedicated for this project . Rick stated that $6, 600 was taken <br /> out for the site plan and abutment design. Rick stated the trail <br /> and bridge are separate items . The trail will be addressed with <br /> the annual trail paving projects . He stated a prefabricated <br /> bridge is more visually pleasing, especially in this scenic, <br /> natural area. <br /> Chair Lindy stated that solid bids are needed for the bridge and <br /> installation. He asked if the slabs are being donated. Molin <br /> has helped the City out with slabs in the past . He stated the <br /> whole issue needs to be revisited. <br /> Paul asked about the anticipated use of the bridge and trail . <br /> ^ Rick stated he believes the trail will be moderately used by the <br /> Wenzel Farms residents and the adjoining neighborhoods . He <br /> stated it is not a destination trail . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.