My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/02/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1998 Park Board Packets
>
11/02/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:52:21 PM
Creation date
7/23/2021 9:47:27 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/02/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes <br /> Park Board Meeting <br /> October 5, 1998 <br /> WEST SHADOW LAKE EXTENSION - RICK CARLSON: <br /> Rick referred to a memo regarding park dedication for the West <br /> Shadow Lake Road Extension. It appears that park dedication for <br /> this project was fulfilled with the Millers South Glenn Project, <br /> with the expansion of Birchwood Acres Park. Based on the master <br /> plan it appears the city needs a trail connection to Birchwood <br /> Acres Park along the north side of the plat, west of West Shadow <br /> Lake Drive . <br /> Mr. Tedd Mattke, Mattke Engineering, Inc . , came forward and <br /> reviewed the memo which indicated their most recent sketch plan <br /> for West Shadow Ponds, dated September 17, 1998, incorporates <br /> comments received from the Planning Commission, including <br /> elimination of the temporary cul-de-sac and constructing West <br /> Shadow Lake Road all the way to 62nd Street, and shifting West <br /> Shadow Lake Road further east at 62nd Street . The project park <br /> dedication requirements were met by the land dedication provided <br /> for this project . He stated that as the trail dedication, it is <br /> anticipated that the Park Board will require construction of the <br /> trail into Birchwood Acres Park along the north side of the plat <br /> as part of this project . <br /> Paul verified that the existing property owner is Mr. Rehbein. <br /> He asked if any other property is needed for dedication. Mr. <br /> Mattke indicated the two parcels square up all park dedication. <br /> Chair Lindy asked where the trail connection from West Shadow <br /> Lake Road into the park will be. Mr. Mattke indicated a 30, wide <br /> trail has already been dedicated along the south border of the <br /> existing homes . Chair Lindy noted there is already a fence there <br /> and it is high land. <br /> Pat asked if there will be a north/south trail . Mr. Mattke <br /> explained that there will be a north/south trail that connects up <br /> with Birch Park. There is also a proposal to connect land into <br /> the Miller South Glen development . <br /> Mr. Mattke asked for the Park Board approval of the plan before <br /> they go before the Planning & Zoning Board. <br /> Chair Lindy stated the plan provides what was asked for. He <br /> stated the Park Board is in agreement on the park dedication for <br /> the West Shadow Lake Extension. <br /> REQUEST FOR FENCING ALONG NEW TRAIL SEGMENT ON ARROWHEAD DRIVEā¢ <br /> Rick stated the trail segment located on Arrowhead Drive directly <br /> south of Shenandoah Park should be completed within the next few <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.