My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/05/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1998 Park Board Packets
>
10/05/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:46:34 PM
Creation date
7/23/2021 10:08:31 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/05/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes <br /> Park Board Meeting <br /> August 3, 1998 <br /> In reviewing the Clearwater Creek Development Phase I and II in <br /> November, 1994, the Park Board made a motion "to accept park land <br /> as noted in Phase I and II . Should the land to the north not be <br /> developed, the developer will give written assurance of a 10 acre <br /> site in the area shown as Phase V" (this is the current Phase III <br /> that is being discussed) . <br /> Rick stated that the park land which was dedicated in Phase I and <br /> II is not suitable for park development. Rick recommended to <br /> require an 8 acre park area be developed to serve the present and <br /> future residents of the Clearwater Creek developments . Because <br /> there will not be any further development to the north, as <br /> originally planned, this area will not build out to 450 homes. <br /> An 8 acre park could still serve the recreational and leisure <br /> needs of this area, without creating an undue hardship to the <br /> developer. <br /> Rick stated there is an existing trail located on the western <br /> edge of the existing Clearwater Creek Development, west of Tele <br /> Lane. It is imperative that this trail continue southward to <br /> provide trail access to the 3rd Addition Development, future <br /> developments, and park areas . <br /> Mr. Quigley stated he will be meeting with the City Consultant <br /> regarding the preliminary plat for the property. He stated the <br /> land to the south is not conducive for a 10 acre park because of <br /> the topography. He indicated the greenway corridor will be an <br /> issue regarding park dedication. He asked for some direction <br /> from the Park Board regarding the park dedication. <br /> Paul expressed concern because there is no mention of land for a <br /> park or recreational facility or trails that link the area to <br /> another park. <br /> Chair Lindy stated the continuation of the transportation trail <br /> has to be addressed. Because of the density of homes in the <br /> area, a plan is needed for open space. He asked where the park <br /> area was to be located in the original plat. <br /> Mr. Quigley explained that the City changed the zoning in the <br /> area where the park was to be developed. Land to the north will <br /> not be developed. He stated the developer does not own all the <br /> land to the south. If a greenway corridor is required, that land <br /> may go to park dedication. <br /> Sharon stated she would like to see a park developed in Phase III <br /> n so the park is centrally located. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.