My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/02/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
08/02/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:25:52 PM
Creation date
7/23/2021 11:22:23 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
08/02/1999
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES APRIL 12, 1999 <br /> 17. A time limit and financial guarantee must apply to the construction of any building <br /> foundation if the building will not be constructed immediately. <br /> 18. Existing driveway access to site reconstructed to eliminate shared access. Costs shall <br /> be borne by the PDO rezoning applicant. <br /> 19. Green space between buildings B and C to be opened up to provide for vehicle <br /> circulation. <br /> 20. Eliminate the 16 parking stalls on the north end of the site to make more space <br /> available for screening as described below. <br /> 21. The developer will work with the clinic on the design of the buffer area to suit the <br /> clinic. <br /> ENE <br /> 22. New plan drawing to include data of square footage totaa of e sce and showing <br /> green space shaded. A minimum of 20%of the si spaee` <br /> 23. Plan for screening of roof mechanicals Sound <br /> 24. A preliminary and final shall be subnutted for=review through the normal subdivison <br /> process when applicant wants to;snbdxviclehe property. <br /> 25. No outside storage <br /> AQ <br /> 26. Improve two a eway to the clinic so that the driveway be relocated to <br /> wherever the c: nclu it is the best place for it. The developer will pay the <br /> relocate t. <br /> 27. Thed;veloper will work with the clinic on the design of the buffer area. <br /> Mayor Sullivan seconded the motion. <br /> Mr. Fogerty suggested he place a$30,000 letter of credit with the City so the City may work <br /> with the clinic to decide what type of buffering is desired. <br /> Mr. Hawkins advised that the City may dictate what type of buffering will be required. <br /> Mayor Sullivan noted that if the application is denied, it may not come before Council again for <br /> one year. <br /> Council Member Lyden asked about the amount of land to be buffered on the north side. Mr. <br /> Smyser stated because it is a PDO,the City can determine the amount of land to be buffered. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.