My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-26-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
07-26-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:35 AM
Creation date
11/4/2021 11:08:40 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/26/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lyngblomsten at Lino Lakes Addition <br />Development Agreement <br />July 26, 2021 <br /> page 3 <br />ii. All site grading shall be conducted in accordance with the grading plan as <br />approved by the City and in accordance with NPDES and RCWD <br />requirements. The Developer shall perform the work in accordance with <br />a Storm Water Pollution Prevention Plan (SWPPP) pursuant to Minnesota <br />Pollution Control Agency (MPCA) requirements. <br />b. Grading and Erosion Control <br />i. The Developer shall grade the site to within 0.2 foot of the grades shown <br />on the approved grading plan. No deviations will be allowed unless a <br />revised plan is submitted and approved by the City and all other <br />regulatory agencies. <br />ii. The street right-of-way, storm water storage ponds, and surface water <br />drainage ways shall be rough mass-graded prior to commencement of <br />utility construction, unless otherwise approved by the City Engineer. <br />iii. The Developer shall be responsible for ascertaining that site geotechnical <br />and groundwater conditions are adequate and conforming with the <br />grading and site improvement as proposed. The developer shall provide <br />testing from an approved testing company and include data on building <br />pads and roadways as outlined in the City standard specifications for <br />construction. <br />iv. The Developer’s engineer shall certify in writing, with an as-built survey, <br />that all grading complies with the approved grading plan prior to issuance <br />of any building permits. The Developer shall promptly clear dirt and <br />debris within public right-of-ways and drainage and utility easements <br />resulting from construction by the Developer, its purchasers, builders and <br />contractors within five (5) days after notification by the City. The <br />Developer shall be responsible for all necessary street and storm sewer <br />maintenance, including street sweeping, until all home construction is <br />completed, unless otherwise released by the City. Warning signs shall be <br />placed when hazards develop in streets to prevent the public from <br />traveling on them, including detour signs if necessary. If and when the <br />streets become impassable, such streets shall be barricaded and closed. <br />The Developer shall maintain a smooth, hard driving surface and <br />adequate drainage on all temporary streets. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base course and wear course shall be furnished and installed. <br />d. Sidewalks, paths and street lighting as required by the City, per the approved <br />plans.
The URL can be used to link to this page
Your browser does not support the video tag.