My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-26-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
07-26-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:35 AM
Creation date
11/4/2021 11:08:40 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/26/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> <br />• The Hodgson/CR J intersection is to be signalized prior to or as part of any significant <br />development in the study area. This is to be a cooperative effort of Anoka and Ramsey <br />Counties, the Cities of Lino Lakes and Shoreview, and developers. Specific design <br />requirements are to be determined. <br /> <br />Signals were installed at the intersection in 2008 and modified in 2017. <br /> <br />• Other road improvement needs such as additional lanes, median, and the like will be <br />designed in cooperation with Anoka and Ramsey Counties, the Cities of Lino Lakes and <br />Shoreview, and developers, as appropriate. Specific design requirements are to be <br />determined. <br /> <br />Lyngblomsten hired SEH to prepare an Intersection Analysis and Alternatives report for the <br />entire CSAH 49 (Hodgson Road) and CR J (Ash Street) intersection. The proposed <br />improvements have been noted above. <br /> <br />Anoka County Highway Department is proposing to be the lead agency on design and letting of <br />the CSAH 49 and CR J road and intersection reconstruction project. Cost sharing details <br />between the entities will be finalized when estimates are complete. Potential road <br />reconstruction will be in 2022 or 2023 to coincide with the Lyngblomsten development. <br /> <br />• The quantity of development of the area will be limited to ensure that traffic generation <br />does not exceed the capacities of Hodgson Road, the intersection with Co Rd J, or the new <br />access. Development shall not create the need for a traffic signal at the new full access on <br />Hodgson Road. <br /> <br />o Planning for the area must look forward to full development of the study area so <br />as not to allow one project to “use up capacity” so that other sites cannot <br />develop without creating the need for a signal at the new access. <br /> <br />As noted, a traffic analysis was completed for the development. Peak trip generation from the <br />proposed development is approximately 1/3 of the trip generation provided for in the Master <br />Plan. No signal is proposed at the new full access. <br /> <br />• Right of way will be dedicated with development to ensure adequate right of way for <br />Hodgson and CR J as well as for the internal circulation system, as necessary. <br /> <br />The final plat dedicates additional right-of-way ranging from 27 ft to 45 ft along CSAH 49 <br />(Hodgson Road) creating 60 ft to 75 ft of dedicated right-of-way from section line and/or <br />roadway centerline. <br /> <br />The final plat also dedicates an additional 10-17 ft of right-of-way along CR J (Ash Street) to <br />provide a full 60 ft from section line. <br />The internal public road is dedicated with 60 ft of right-of-way. <br /> <br />Overall, the proposed development is consistent with the Transportation and Access goals of <br />the Master Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.