Laserfiche WebLink
Wetland <br />Scientist <br />Task Description TBD <br />1.1 2 1 8 11 $1,506.00 <br />1.2 1 2 3 $432.00 <br />1.3 8 8 2 18 $2,746.00 <br />1.4 4 1 4 9 $1,410.00 <br />1.5 12 1 4 40 8 20 85 $11,498.00 <br />1.6 4 1 16 21 $2,850.00 <br />1.7 1 1 3 5 $714.00 <br />1.8 8 1 8 17 $2,658.00 <br />1.9 18 2 40 8 68 $9,332.00 <br />1.10 Meetings 21 21 2 44 $6,740.00 <br />Total Estimated Hours and Fees 79 8 114 40 8 20 2 10 281 <br />Average Hourly Billing Rate $192 $162 $120 $150 $119 $80 $125 $94 <br />TOTAL PROJECT COST $39,886.00 <br />Total <br />Hours <br />Project <br />Manager <br />Jon ChristensenGreg Johnson Greg Glunz <br />Report preparation <br />Alternative water supply options <br />Eva Kelly <br />Process <br />Drafting <br />Technician <br />Diane Hankee <br />Estimate of Hours and Fees <br />City of Lino Lakes, Minnesota <br />Water Treatment Plant Feasibility Study <br />Estimated Hours <br />AdminProject Engineer Landscape <br />Designer <br />Landscape <br />Architect Cost <br />Study neighborhood impacts <br />Determine estimated costs <br />Karla Pederson <br />City Engineer <br />Shaunna Berg <br />Analyze source water <br />Water treatment options and plant tours <br />Review of existing site <br />Centralized WTP preliminary drawings <br />Water distribution system modeling and watermain phasing