My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-13-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
04-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 12:29:26 PM
Creation date
11/17/2021 11:24:27 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/13/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Community Development\Projects\Capital Improvement Projects\2020 Street Rehabilitation Project\Staff Reports\20200413 CC Award Project & Const <br />Services\4. 20200303 Construction Services Proposal.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM April 2, 2020 <br /> <br /> <br /> <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br /> <br />Re: Proposal for Construction Services for 2020 Street Rehabilitation Project <br />WSB Project No. R-015071-000 <br /> <br />Dear Mr. Grochala: <br /> <br />WSB & Associates, Inc. is pleased to present to you this proposal for construction services <br />associated with the City’s 2020 Street Rehabilitation Project. This construction services proposal <br />would be subsequent to the City Council awarding the construction contract. <br /> <br />The City of Lino Lakes is requesting assistance with the construction services for the 2020 Street <br />Rehabilitation Project. The streets designated for rehabilitation are local streets as determined by <br />their OCI ratings established in the City’s Pavement Management Study. A summary of the 2020 <br />Street Rehabilitation Project is described as follows: <br /> <br />Full Depth Reclamation, cur b and gutter and storm sewer repair <br />• Deerwood Lane, between Birch Street and Fox Road <br />• Fox Road, between West Shadow Lake Drive and Deerwood Lane <br /> <br />Watermain Repair <br />• Bolt replacement on identified gate valves and services <br /> <br />Bituminous Overlay <br />• Carl St., 77th St. E., Gordon Ave. N., Rehbein St., Peltier Lake Dr. <br /> <br />Curb Replacement <br />• Town Center Parkway <br /> <br />The project bid also included an alternate for cul du sacs within the project area. It is our <br />understanding that the City will not be awarding the alternate bid. This proposal is based on the <br />work included in the base bid only. <br /> <br />Scope of Engineering Services <br /> <br />WSB is pleased to provide professional construction engineering services for the 2020 Street <br />Rehabilitation Project including contract administration, construction observation, construction <br />staking, and public involvement with project stakeholders. Below is a detailed description of the <br />engineering services and WSB’s proposed approach. <br /> <br />I. Construction Services <br />a. Project Management/Contract Administration
The URL can be used to link to this page
Your browser does not support the video tag.