Laserfiche WebLink
3 <br /> <br />Current Zoning LI, Light Industrial <br />Current Land Use Industrial <br />Future Land Use per CP Industrial <br />Utility Staging Area 1A=2008-2015 <br /> <br />Surrounding Zoning and Land Use <br /> <br />Direction Zoning Current Land Use Future Land Use <br />North GB, General <br />Business Vacant Commercial Commercial <br />East <br />PUD, Planned <br />Unit <br />Development <br />Residential Townhomes <br />(Victor Gardens, <br />City of Hugo) <br />Mixed Use <br />South LI, Light <br />Industrial Vacant Industrial Industrial <br />West LI, Light <br />Industrial Industrial Industrial <br /> <br />Site and Building Plan Review <br /> <br />Site Plan <br /> <br />The site plan proposes a second, stand-alone 37,284 sf training facility being constructed to the <br />east of the existing facility. The new facility will be constructed in 2 phases. Phase 1 is <br />approximately 24,977 sf and Phase 2 is 12,307 sf. There is no dedicated timeline for the Phase <br />2 construction. All utilities and parking lots will be constructed in Phase 1. A west storm <br />water pond south of the exiting parking lot and an east pond south of the new facility are <br />proposed. A new 91 stall parking lot south of the existing building will connect with the <br />existing parking lot and a new driveway will ingress/egress to the east at the current driveway <br />location. <br /> <br />A Site Plan Review Worksheet detailing setbacks and performance standards has been <br />completed. Overall, the proposed campus expansion and parking lot meet setback and <br />performance standard requirements. <br /> <br />Lot Size & Setbacks <br /> <br /> LI <br />Requirements LTC <br />Min. Lot Size 1 acre 18 acres <br />Min. Lot Width <br />-Interior Lot 100 ft 600+ft