My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-06-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
07-06-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 2:38:35 PM
Creation date
11/17/2021 11:41:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/06/2020
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> <br />-Corner Lot NA NA <br />Building Setback <br />-From Streets <br />--Local Street NA NA <br />--Collector or Arterial 50ft 265 ft <br />--Corner lot NA NA <br />-Rear <br />--Principal 15 ft 850+ ft <br />--Accessory 10 ft NA <br />-Side (east) <br />--Principal1 75 ft 75 ft <br />--Accessory 10 ft NA <br />-Side (west) <br />--Principal 10 ft 165 ft <br />--Accessory 10 ft NA <br />Buffer <br />40ft if side or <br />rear lot abuts <br />residential <br />40ft buffer <br />provided along <br />east lot line <br /> <br />1Per the LI, Light Industrial District, industrial building setback from residential properties is <br />75 ft. <br /> <br />Architectural Plans and Exterior Building Materials <br /> <br />The new building is designed to look like the existing building in order to create a campus like <br />setting. Per the architectural plan set prepared by Architecture Advantage dated May 11, 2020, <br />the exterior materials of the building include reddish brown rockface CMU, light beige <br />rockface CMU accent bands and cream metal fascia & standing seam roof. The exterior <br />materials meet the ordinance requirements of material types, colors and percentages. <br /> <br />The building floor plan is 37,284 sf and consists of three (3) working bays, two (2) shop areas, <br />six (6) classrooms, several offices, 100 seat auditorium, storage, toilet rooms, utility rooms and <br />hallways. A second floor mezzanine is proposed over the working bays. <br /> <br />The new facility will be constructed in 2 phases. Phase 1 is approximately 24,977 sf and Phase <br />2 is 12,307 sf. There is no dedicated timeline for the Phase 2 construction. <br />The building height is 32’ 8” to the peak of the roof which is less than the maximum allowed <br />45 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.