Laserfiche WebLink
4 <br /> <br />-Corner Lot NA NA <br />Building Setback <br />-From Streets <br />--Local Street NA NA <br />--Collector or Arterial 50ft 265 ft <br />--Corner lot NA NA <br />-Rear <br />--Principal 15 ft 850+ ft <br />--Accessory 10 ft NA <br />-Side (east) <br />--Principal1 75 ft 75 ft <br />--Accessory 10 ft NA <br />-Side (west) <br />--Principal 10 ft 165 ft <br />--Accessory 10 ft NA <br />Buffer <br />40ft if side or <br />rear lot abuts <br />residential <br />40ft buffer <br />provided along <br />east lot line <br /> <br />1Per the LI, Light Industrial District, industrial building setback from residential properties is <br />75 ft. <br /> <br />Architectural Plans and Exterior Building Materials <br /> <br />The new building is designed to look like the existing building in order to create a campus like <br />setting. Per the architectural plan set prepared by Architecture Advantage dated May 11, 2020, <br />the exterior materials of the building include reddish brown rockface CMU, light beige <br />rockface CMU accent bands and cream metal fascia & standing seam roof. The exterior <br />materials meet the ordinance requirements of material types, colors and percentages. <br /> <br />The building floor plan is 37,284 sf and consists of three (3) working bays, two (2) shop areas, <br />six (6) classrooms, several offices, 100 seat auditorium, storage, toilet rooms, utility rooms and <br />hallways. A second floor mezzanine is proposed over the working bays. <br /> <br />The new facility will be constructed in 2 phases. Phase 1 is approximately 24,977 sf and Phase <br />2 is 12,307 sf. There is no dedicated timeline for the Phase 2 construction. <br />The building height is 32’ 8” to the peak of the roof which is less than the maximum allowed <br />45 feet. <br />