My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-05-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
10-05-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 4:24:27 PM
Creation date
11/17/2021 11:55:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/05/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> <br />• Sidewalks and trails shall be incorporated throughout the development. <br />• The south connection to CSAH 54 (20th Avenue) shall occur in the first phase of <br />development. <br />• Sidewalks shall be incorporated though out the development. <br />• A noise study for the entire development is required. Staff anticipates a noise <br />wall will be required along I-35E. <br /> <br />Easements <br /> <br />Staff Comments: <br /> <br />• Standard drainage and utility easements at least 10 feet wide shall be provided <br />along all lot lines. <br />• Drainage and utility easements shall also be dedicated over stormwater <br />management facilities. <br />• Conservation easements shall be required over wetlands and greenway corridors. <br /> <br />Stormwater Management and Erosion and Sediment Control <br /> <br />The concept plan does not show stormwater management facilities. <br /> <br />Staff Comment: <br /> <br />• A stormwater management plan and erosion and sediment control plan in <br />accordance with Chapter 1011 shall be required. <br /> <br />Utilities <br /> <br />Public water, sanitary and storm sewer utilities will be installed within the development. <br /> <br />The site is located in Sanitary Sewer District 3 (Sub-district 3C). Flow is collected along <br />East Cedar Street and conveyed east to MCES Meter M220. <br />Outlot A, NorthPointe 5th Addition is located in Utility Staging Area 1A (2018-2025). <br />Two of the 3 Burque parcels are in Utility Staging Area 1B (2025-2030). The 3rd Burque <br />parcel is in Utility Staging Area 3 (Post 2040). <br /> <br />Municipal water and sanitary sewer utilities to serve the Burque development exist along <br />Cypress Street and Chestnut Street in NorthPointe. <br /> <br />Staff Comments: <br /> <br />• Per the City Engineer, sanitary sewer to serve this development shall come from <br />Cypress Street. The sewer line in Chestnut Street does not have enough depth to <br />serve the proposed development. <br />• A comprehensive plan amendment to move from Utility Staging Area 3 to 1A is <br />required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.