My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/08/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
12/08/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:30:23 AM
Creation date
12/3/2021 3:54:10 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/08/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/1 /2021 <br />Page 5 <br />7 II d+ hammerhead tur +u nnarr�e LJRd <br />�. eat a„ -ad �he+tr<erear� GUI de <br />A-+ +hoy oo+ and of RA-16 ry VVay <br />Wetlands and Mitigation Plan <br />Kjolhaug Environmental Services Company, Inc. (Kjolhaug) delineated the wetlands on <br />site in June of 2021. There are five wetlands located onsite. Wetland 1 is a Type 3/2/1 <br />shallow marsh, wet meadow, farmed seasonally flooded basin complex and is <br />approximately 2.47 acres. Wetland 2 is a Type 3/6/2 shallow marsh, shrub-carr, wet <br />meadow complex and is approximately 0.56 acres. Wetland 3 (0.74 acres), Wetland 4 <br />(0.08 acres), and Wetland 5 (0.05 acres) are all Type 1 farmed seasonally flooded basins. <br />As currently proposed, the project will permanently impact 0.7381 acres of Wetland 3 in <br />the southeast corner of the site. The applicant is proposing to purchase wetland back <br />credits. The project area is not located within the Lino Lakes Comprehensive Wetland <br />Protection and Management Plan (CWPMP) and are not within the Wetland Management <br />Corridor (WMC). <br />Kjolhaug prepared a Wetland Permit Application dated September 13, 2021. The <br />application was submitted to the Board of Water and Soil Resources the same day and <br />the Rice Creek Watershed District comments are due to the applicant on October 8, 2021 <br />Comments: <br />1 Applicant to include 10 ft buffers a uRd Wetlands 1 -and- 2 Drainage aR l <br />Utility easements o required ever the i.Vo+lon.d h� �fforo <br />Easements added to plan <br />• Landscaping <br />Landscaping plans were provided as part of the AECP plan set. No landscaping is <br />proposed for Lot 2 at this time. <br />Comments: <br />1. Staff recommends adjusting landscaping so that no trees are planted over <br />utility pipes. <br />Plan revised. <br />Staff has concerns about the locations of the Heritage Oak tree and the <br />Sienna Glen Maple tree that are closest to the storm sewer pipes for the <br />Belland Farms & Associated Eye Care Partners Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.