Laserfiche WebLink
1. The final plat substantially conforms to the approved preliminary plat subject to <br /> the conditions listed below. <br /> 2. The City Attorney has reviewed the status of title/property ownership related to <br /> the final plat and provided comments as noted below. <br /> 3. A Development Agreement has been drafted and shall be executed. <br /> 4. Conditions attached to approval of the preliminary plat have been fulfilled or <br /> secured by the Development Agreement. <br /> 5. All fees, charges and escrow related to the preliminary or final plat have been <br /> paid in full. <br /> BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby <br /> approves NorthPointe 8th Addition PUD Final Plan/Final Plat subject to the following <br /> conditions: <br /> 1. The existing conservation easement and wetland buffer declaration may be <br /> amended with approval from RCWD. <br /> 2. A Development Agreement and securities related to the final plat are required. <br /> 3. A Site Performance Agreement and securities related to NorthPointe Garden <br /> Estates are required or securities shall be collected with the Development <br /> Agreement. <br /> 4. A Declaration for Maintenance of Stormwater Facilities related to the private <br /> stormwater management facilities is required. <br /> 5. A Declaration of Covenants detailing age-restriction is required. <br /> 6. A temporary cul-de-sac easement and exhibit are required over the cul-de-sac. <br /> 7. Separate sign permit applications are required for all permanent monument/pylon <br /> and wall signage. <br /> 8. Separate sign permit applications are required for all temporary signage. <br /> 9. PUD, Planned Unit Development flexibility is provided to reduce the principal <br /> and accessory building setback along I-35E from 40ft to 20ft. <br /> 10. All parking stalls (surface, interior garage and detached garage) shall be provided <br /> rent free to all tenants. <br /> 11. The following noise mitigation standards apply: <br /> a. The building is constructed in such a way that the exterior to interior <br /> sound level attenuation is at least 30 dB(A). <br /> b. All housing units shall provide year-round climate control. <br /> c. STC 30 windows shall be used for all windows. <br /> d. Exterior wall construction shall consist of the following or comparable <br /> materials: <br /> i. APA rated sheathing located on the exterior side of the exterior <br /> wall. <br /> 1. This material will be 7/16"thick and a wood fiber material. <br /> ii. Exterior wall shall be 2x6 studs with R-21 batt insulation. <br /> iii. The inside finish shall be 5/8" gypsum board. <br /> iv. Lap siding shall have a thickness of.354" and be of a wood fibrous <br /> material. <br /> v. Trim around the windows shall have a thickness of.970" and be of <br /> a wood fibrous material. <br /> 2 <br />