Laserfiche WebLink
Off -Street Parking Requirements <br />Per City Code Section 1007.044(6), auto repair requires 2 spaces per serving bay; the service <br />bay is not a parking space. The PTAC is proposing 6 service bays and would require 12 <br />parking stalls. The site plan provides 2-5 24 parking stalls with 1 of them being ADA <br />compliant. Parking requirements are met. <br />Staff notes that if there is a need for reduced hardcover or more landscaping, some of the extra <br />parking stalls could be eliminated. <br />Grading Plan and Stormwater Management <br />Per City Engineer Memo dated February 23, 2022, the stormwater on the existing site flows <br />to the south to a stormwater facility on the adjacent property and eventually flows to a City of <br />Lino Lakes pond located in Lino Park. <br />The surface water from the proposed building and parking lot will flow to several proposed <br />infiltration basins along the west, north, and east sides of the property and to a drainage pond <br />on the south side of the site. Rain guardian turrets are proposed to direct runoff to the <br />infiltration basins and the drainage pond. The infiltration basins are designed to provide <br />water quality treatment and rate control. <br />The site is proposed to outlet to a City of Lino Lakes pond east of the site that was <br />constructed during the Pine Glen development. Staff worked with the applicant to verify that <br />the pond has capacity to handle the runoff from the proposed site. <br />Public Utilities <br />The proposed building will be municipally served by a 12" DIP watermain and a 2 1 " PVC <br />sanitary sewer located along CSAH 23 (Lake Drive). <br />Tree Preservation and Mitigation Standards <br />The Environmental Coordinator and Environmental Board reviewed the tree preservation and <br />landscaping plans. Per the November 30, 2021 Environmental Board staff report and February <br />15, 2022 Environmental Coordinator memo: <br />A tree inventory and tree preservation and mitigation plan must be have been provided. <br />Twenty-one (21) trees are being removed requiring 16 mitigation trees. These trees have been <br />provided and tree mitigation requirements have been met. <br />Open Areas Landscape Standards <br />There is 6,150 sq. ft. of open space that requires 3 large trees and 9 large shrubs. <br />Six (6) large trees or large tree equivalents and 18 large shrub equivalents have been provided. <br />