My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Stormwater management ponds, if used, should be designed to be a site amenity, <br />including appropriate landscape elements. <br />Per the revised Storm Water Management Report prepared by Anderson -Johnson <br />Associates dated Mar -eh July 13, 2020, rate control is being <br />accomplished using a combination of a dry pond and a storm water treatment pond. The <br />dry pond is now located where the original community gardens were proposed. The <br />proposed rate is less than 80% of the existing rate of runoff. <br />Water quality treatment is accomplished at the single stormwater treatment pond. True <br />infiltration was considered during the design phase, but several factors contributed to not <br />pursuing infiltration practices. First, shallow groundwater exists on site. According to the <br />soil borings, groundwater is in the 895 to 897 elevation range. A majority of the low <br />points are around elevation 905 with one parking lot having a low point of about 902.5. <br />This would mean the surface of an infiltration area would need to be at elevation 900 - <br />901 for effective drainage to occur. Additionally, the site has been maximized and there <br />is not adequate space for effective infiltration practices. <br />Instead, a stormwater pond has been constructed. The stormwater pond, in addition to <br />providing rate control, has been sized to provide adequate dead storage below the normal <br />water level to meet water quality requirements. Finally, an irrigation pumping station will <br />be constructed at the stormwater pond to draw water from the pond to irrigate the <br />surrounding areas. <br />As detailed in the May 11, 2020 Council staff report and Resolution No. 22-44 approving <br />PUD Development Stage Plan Amendment #1 to the site plan and grading & drainage <br />plan, the clubhouse was omitted in order to enlarge to the stormwater pond to provide <br />more capacity. <br />Pond Size Comparison <br />Original Pond 3P <br />Enlarged Pond 3P <br />Surface Area <br />0.56 acres <br />1 <br />0.82 acres <br />Volume <br />2.810 acre ft <br />3.869 acre ft <br />RCWD issued an amended Conditional Approval Pending Receipt of Changes <br />(CAPROC) on March 13, 2020. The District Engineer finds the revised grading and <br />stormwater management plans compliant with RCWD rules. <br />The City's stormwater management ordinance requires 4 ft of separation between low <br />floor freeboard and groundwater. In order to minimize the site being built up to meet <br />this requirement, this separation distance may be reduced upon submittal of a <br />geotechnical report and design by a licensed engineer. This report shall define ground <br />water level elevations for the senior living complex and include plans demonstrating that <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.