My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-030 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-030 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 7:26:42 PM
Creation date
3/18/2022 9:52:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/14/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Katie Larsen <br /> 2/4/2022 <br /> Page 2 <br /> is within the Rice Creek Watershed District(RCWD). The applicant is proposed sediment <br /> control log to surround the stock pile. <br /> Comments: <br /> 1. Applicant to update plans to address comments provided by the City's <br /> Environmental Coordinator regarding erosion control. <br /> 2. Applicant to add turf establishment details to the plans (i.e. seed mix type and <br /> application rate, hydromulch type and application rate, etc.) <br /> 3. No work shall be completed until a Rice Creek Watershed District permit has <br /> been obtained. <br /> • Water Supply <br /> There is currently an existing 8-inch diameter ductile iron pipe (DIP)water main along 215t <br /> Avenue S and existing 16-inch diameter DIP water main in an easement in Outlot A of the <br /> Clearwater Creek Business Center Plat(PID 24-31-22-24-0009). <br /> The applicant is not proposing any connections to the municipal water system with this <br /> plan. <br /> Staff does not have any comments at this time. <br /> • Sanitary Sewer <br /> There is currently an existing 8-inch diameter polyvinyl chloride(PVC)sewer main along <br /> 21st Avenue S on the north end of the site and existing 21-inch diameter PVC sanitary <br /> sewer in an easement in Outlot A of the Clearwater Creek Business Center Plat(PID 24- <br /> 31-22-24-0009). <br /> The applicant is not proposing any connections to the municipal sanitary sewer system <br /> with this plan. <br /> Comments: <br /> 1. Applicant to provide sanitation facilities on site for employees. <br /> • Transportation <br /> The site is located at the intersection 21st Avenue S and Commerce Drive. The applicant is <br /> proposing access the site on 215t Avenue S via a gravel driveway. 21st Avenue S is a local <br /> street on the Centerville/Lino Lakes border. The existing right-of-way along 21st Avenue S <br /> varies in width from 50-ft to 73-ft. <br /> The applicant estimates that the maximum truck traffic will be 50 trucks per day visiting the <br /> site. The applicant has an existing black dirt facility on 21st Avenue S south of this project in <br /> Centerville. <br /> Comments: <br /> 1. Tracking on 21st Ave S has been an issue with the existing stock pile operations. <br /> The applicant shall extend the proposed gravel entrance to reduce tracking. <br /> Access should come off of Commerce Drive easterly stub. <br /> Rehbein Black Dirt CUP Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.