My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-14-2022 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
03-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:46:30 PM
Creation date
3/21/2022 12:36:33 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/14/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ALTA/NSPS Land Title Survey prepared by EG Rud & Sons, Inc. dated December 23, <br />2021 <br />• Site, Grading, Erosion and Sediment Control Plan prepared by Carlson McCain dated <br />January 10, 2022 <br />• Clearwater Creek Business Center North Wetland Delineation Report prepared by <br />Kjolhaug Environmental Services Company, Inc., dated August 5, 2021 <br />• Preliminary Geotechnical Exploration Report, Haugo Geotechnical Services, dated <br />November 26, 2021 <br />• Applicant's Rice Creek Watershed District permit application, dated January 10, 2022 <br />ANALYSIS <br />Section 1007.050 of the Zoning Ordinance establishes requirements for earth moving and land <br />reclamation. Earth removal, land reclamation, material storage or filling is a permitted use in <br />all zoning districts. A conditional use permit is required when 5,000 cubic yards or more of <br />material is planned to be removed or deposited on any lot or parcel. <br />The three parcels are approximately 18.36 acres and are located between 21st Avenue S and I- <br />35E. The proposed stockpile will be approximately 2.7 acres in area, will have a maximum <br />height of 40 feet, and will be approximately 100,000 cubic yards of black dirt according to the <br />plans. The applicant estimates there will be a maximum of 50 trucks per day accessing the site. <br />Access <br />The site is located at the intersection of 21" Avenue S and Commerce Drive. The applicant is <br />currently proposing access to the site from 21St Avenue S via a rock construction entrance that <br />will be converted to a gravel entrance after the initial import of the black dirt material. <br />Wetlands <br />Wetlands are shown on the plan sheet and do not appear to be impacted by the black dirt <br />stockpile. A wetland delineation was completed onsite in June of 2021 by Kjolhaug <br />Environmental Services Company, Inc. The Wetland Delineation Report dated August 5, 2021 <br />states there are five (5) wetlands onsite. The estimated wetland boundaries are shown to be at a <br />sufficient distance from the proposed areas of disturbance. As the proposed, the project will <br />not impact any wetlands. <br />Drainage Ditches <br />Judicial Ditch No. 3 (Clearwater Creek) borders adjacent property to the south of the site and a <br />private drainage ditch runs on the easterly side of the property. The applicant is not proposing <br />any changes to the existing drainage patterns to the drainage ditches. <br />Floodplain <br />The 2015 DFIRM indicates Zone A floodplain on the site. The applicant is not proposing any <br />impacts to the floodplain on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.