Laserfiche WebLink
Bid Tabulation <br />2022 East Shadow Lake Drive Utility Project (#8144580) wsb <br />City of Lino Lakes, MN <br />WSB Project No. 017705-000 <br />Bid Opening: Tuesday, April 19, 2022, at 10:00 am <br />DENOTES CORRECTED FIGURE <br />Northdale Construction <br />Engineer's Estimate Dresel Contracting Inc. Company, Inc. <br />Line No. <br />Material No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />60 <br />2504.602 <br />6" GATE VALVE & BOX <br />EACH <br />2 <br />$2,000.00 <br />$4,000.00 <br />$3,528.00 <br />$7,056.00 <br />$2,662.91 <br />$5,325.82 <br />61 <br />2504.602 <br />12" GATE VALVE & BOX <br />EACH <br />2 <br />$3,500.00 <br />$7,000.00 <br />$6,860.00 <br />$13,720.00 <br />$5,621.78 <br />$11,243.56 <br />62 <br />2504.602 <br />1" CURB STOP & BOX <br />EACH <br />6 <br />$425.00 <br />$2,550.00 <br />$1,000.53 <br />$6,003.18 <br />$525.18 <br />$3,151.08 <br />63 <br />2504.602 <br />SACRIFICIAL ANODE BAG (32 LB) <br />EACH <br />2 <br />$200.00 <br />$400.00 <br />$722.40 <br />$1,444.80 <br />$662.74 <br />$1,325.48 <br />64 <br />2504.603 <br />1" TYPE K COPPER PIPE <br />L F <br />213 <br />$25.00 <br />$5,325.00 <br />$52.28 <br />$11,135.64 <br />$72.79 <br />$15,504.27 <br />65 <br />2504.603 <br />6" PVC WATERMAIN <br />L F <br />18 <br />$40.00 <br />$720.00 <br />$75.91 <br />$1,366.38 <br />$84.56 <br />$1,522.08 <br />66 <br />2504.603 <br />12" PVC WATERMAIN <br />L F <br />345 <br />$42.00 <br />$14,490.00 <br />$95.25 <br />$32,861.25 <br />$103.98 <br />$35,873.10 <br />67 <br />2504.604 <br />4" POLYSTYRENE INSULATION <br />S Y <br />25 <br />$35.00 <br />$875.00 <br />$58.91 <br />$1,472.75 <br />$67.98 <br />$1,699.50 <br />68 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />LB <br />500 <br />$8.00 <br />$4,000.00 <br />$17.92 <br />$8,960.00 <br />$26.69 <br />$13,345.00 <br />$81,313.00 <br />$137,401.28 <br />$147,061.28 <br />D. STORM SEWER IMPROVEMENTS <br />69 <br />2104.502 <br />REMOVE CASTING <br />EACH <br />6 <br />$250.00 <br />$1,500.00 <br />$177.33 <br />$1,063.98 <br />$260.87 <br />$1,565.22 <br />70 <br />2104.502 <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />6 <br />$600.00 <br />$3,600.00 <br />$354.67 <br />$2,128.02 <br />$1,043.48 <br />$6,260.88 <br />71 <br />2104.503 <br />REMOVE SEWER PIPE (STORM) <br />L F <br />162 <br />$8.00 <br />$1,296.00 <br />$19.70 <br />$3,191.40 <br />$20.87 <br />$3,380.94 <br />72 <br />2502.503 <br />4" PERF PE PIPE DRAIN <br />L F <br />400 <br />$8.00 <br />$3,200.00 <br />$6.66 <br />$2,664.00 <br />$30.27 <br />$12,108.00 <br />73 <br />2503.503 <br />15" RC PIPE SEWER DES 3006 CL V <br />L F <br />93 <br />$62.00 <br />$5,766.00 <br />$75.76 <br />$7,045.68 <br />$99.35 <br />$9,239.55 <br />74 <br />2503.503 <br />24" RC PIPE SEWER DES 3006 CL III <br />L F <br />60 <br />$74.00 <br />$4,440.00 <br />$117.04 <br />$7,022.40 <br />$121.80 <br />$7,308.00 <br />75 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />2 <br />$1,200.00 <br />$2,400.00 <br />$532.00 <br />$1,064.00 <br />$2,415.43 <br />$4,830.86 <br />76 <br />2506.502 <br />CASTING ASSEMBLY <br />EACH <br />3 <br />$350.00 <br />$1,050.00 <br />$672.00 <br />$2,016.00 <br />$1,521.49 <br />$4,564.47 <br />77 <br />2506.503 <br />CONST DRAINAGE STRUCTURE DES 48-4020 <br />L F <br />9.3 <br />$600.00 <br />$5,580.00 <br />$699.22 <br />$6,502.75 <br />$868.83 <br />$8,080.12 <br />78 <br />2506.503 <br />CONST DRAINAGE STRUCTURE DES 60-4020 <br />L F <br />4.2 <br />$700.00 <br />$2,940.00 <br />$1,346.67 <br />$5,656.01 <br />$1,445.95 <br />$6,072.99 <br />79 <br />2506.602 <br />CONST DRAINAGE STRUCTURE DESIGN SPEC (2'X3') <br />EACH <br />3 <br />$1,500.00 <br />$4,500.00 <br />$2,128.00 <br />$6,384.00 <br />$2,845.65 <br />$8,536.95 <br />$36,272.00 <br />$44,738.24 <br />$71,947.98 <br />BASE BID TOTAL: <br />$443,980.50 <br />$547,438.11 <br />$675,676.43 <br />