My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2022 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2022
>
05/11/2022 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2022 11:59:22 AM
Creation date
5/6/2022 3:01:51 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
05/11/2022
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative Urban Areawide Review (AUAR) <br />The site is within the 2005 I-35E Corridor AUAR environmental review boundary. The <br />AUAR was updated in May 2020. The AUAR identifies this site as commercial in the <br />land use scenarios. The Otter Crossing 2nd Addition preliminary plat and Tidal Wave <br />Auto Spa development are consistent with commercial development. No further <br />environmental assessment is required. <br />Wetlands <br />As part of Otter Crossing Ist Addition, a wetland delineation report was completed by <br />Midwest Natural Resources on September 4, 2019. A WCA Notice of Decision was <br />issued by RCWD on December 9, 2019. Two wetlands were delineated. Wetland A was <br />2.59 acres and Wetland B is 1.19 acres. Impacts to Wetland A have been completed and <br />mitigated via wetland credits. A drainage & utility easement was dedicated on the final <br />plat over the stormwater pond and remainder of Wetland A. The wetlands are not within <br />the Wetland Management Corridor (WMC) so a WMC wetland buffer was not required. <br />No further wetland impacts are proposed with development of Otter Crossing 2nd <br />Addition. <br />Shoreland District <br />The development is not located in the Shoreland District. <br />Floodplain <br />There is no FEMA floodplain on site. <br />Anoka County Highway Department <br />Anoka County Highway Department reviewed the preliminary plat and had no concerns. <br />The applicant shall obtain the required Anoka County Highway Department permits. <br />Public Safety Comments <br />The Fire Division notes a hydrant shall be located in the northwest corner of the property. <br />The Police Division had no issues that needed to be addressed. They did recommend <br />good quality camera systems be installed. <br />Environmental Board <br />The Environmental Board reviewed the development proposal at their May 4, 2022 <br />meeting. One comment that was made was the consideration of diverting the stormwater <br />to the water recycling process used for the car wash. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.