Laserfiche WebLink
Ms. Katie Larsen <br />5/6/2022 <br />Page 2 <br />accept TWAS plans referencing the Otter Crossing 2nd Additions plans as work <br />done by others. <br />(5/6/2022) Applicant to confirm if irrigation services are redundant or needed. <br />One is currently shown outside of the building on C8.0 and another is shown <br />inside the mechanical room on sheet P103 (attached to SAC determination) <br />• Grading & Stormwater Management <br />The TWAS project will require site grading for the proposed building and parking lot. The <br />proposed project is within the Rice Creek Watershed District (RCWD). Stormwater BMPs <br />are needed to meet City stormwater requirements. The applicant is proposing to meet City <br />stormwater requirements by utilizing a pond previously constructed with the Otter <br />Crossing 1st addition. <br />Comments: <br />1. (5/6/2022) Bowman design team to work with the Pioneer Engineering design <br />team currently working on the Otter Crossing 2nd Addition plans to correctly show <br />the utilities along Street A that are being installed with the Otter Crossing 2nd <br />Addition project. The layout, materials, and size of the utilities along Street A <br />should be the same in both plan sets. The city will accept TWAS plans <br />referencing the Otter Crossing 2nd Additions plans as work done by others. <br />2. (5/6/2022) The storm sewer in the parking lot will be private and a stormwater <br />maintenance declaration will be required. <br />3. (5/6/2022) Applicant to update stormwater management report to reflect utilities <br />proposed with Otter Crossing 2nd Addition plans. <br />4. (5/6/2022) Applicant to update stormwater management report to include the <br />6/22/2021 revision of the Otter Crossing Stormwater Management Plan. <br />5. (5/6/2022) Applicant to update Appendix 7 of the stormwater management report <br />to include a post development plan that matches other civil plans in the submittal. <br />6. (5/6/2022) Applicant shall label proposed contours with elevations on sheet C6.0. <br />7. (5/6/2022) Applicant to provide EOF location and elevation for low point on site <br />around structure 1-1. <br />8. (5/6/2022) It is not permissible to have storm sewer pipes proposed with 0% <br />slopes. Positive drainage is required for water conveyance. <br />9. (5/6/2022) Applicant to provide rational method calculations showing site storm sewer <br />can provide conveyance of flows from the 10-year storm event. <br />10. (5/6/2022) Applicant to include calculation of curve number given on Sheet C6.2. <br />• Water Supply <br />There is an 8-inch diameter polyvinyl chloride (PVC) water main proposed along Street A <br />in the Otter Crossing 2nd Addition plans. The TWAS plans show 8" ductile iron pipe (DIP) <br />water main along Street A. <br />Comments: <br />1. (5/6/2022) See Note 1 under Grading and Stormwater Management and update <br />water main as necessary. Please work with the Otter Crossing 2nd Addition team <br />so they include a stub for the fire suppression line shown on the TWAS plans. <br />Tidal Wave Auto Spa Engineering Review <br />