My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERVICE GROUP: <br />Water Resources <br />EDUCATION: <br />University of Minnesota, <br />Twin Cities, 2021 <br />MEMBERSHIPS: <br />American Society of Civil <br />Engineers <br />Henry Meeker, EIT <br />GRADUATE ENGINEER <br />Henry is a starting water resources engineer in training. After graduation with a civil <br />engineering degree focused on water resources, he began working full time with WSB. <br />Henry has experience with bathymetry mapping, spread and run calculations, and pipe <br />design. <br />Champlin Heights Road Reconstruction I Champlin, MN <br />CLIENT: CITY OF CHAMPLIN <br />PROJECT DURATION: JUL 2019- AUG 2019 <br />Henry was part of the team that completed feasibility -level design of new stormwater catchbasins <br />and conveyance systems for the project area. This work included GIs drainage mapping and spread <br />and run calculations. The project ultimately helped maintain drivable streets for the city of Champlin. <br />Woodbury Pond Bathymetry I Woodbury, MN <br />CLIENT: CITY OF WOODBURY <br />PROJECT DURATION: JUN 2019 <br />Based on data collected in the field, Henry used GIs software to build bathymetric maps of <br />numerous ponds. These maps were used by the city of Woodbury to assess pond behavior and <br />pollutant removal capacity. <br />MS4 Monitoring I St. Paul, MN <br />CLIENT: CITY OF ST. PAUL <br />PROJECT DURATION: JUN 2020- SEP 2020 <br />Henry was part of a team that monitored stormwater flows and quality throughout the summer of <br />2020 for the city of St. Paul. Monitoring involved data collection, sample collection, and analysis. <br />This monitoring resulted in the development of the city's municipal separate storm sewer system <br />(MS4) permit, required annually by the Minnesota Pollution Control Agency. <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Project Personnel 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.