Laserfiche WebLink
SERVICE GROUP: <br />Water/Wastewater <br />REGISTRATION: <br />Professional Engineer <br />M N #57772 <br />EDUCATION: <br />BS Civil Engineering, <br />University of Minnesota, <br />2015 <br />MEMBERSHIPS + <br />RECOGNITIONS: <br />Minnesota Groundwater <br />Association <br />American Water Works <br />Association <br />Ray Theiler, PE <br />PROJECT ENGINEER <br />Ray is a Professional Engineer with seven years of experience in water and <br />wastewater engineering including: water supply systems, groundwater supplies, <br />sanitary sewer collection systems, water treatment pilot studies, and water reuse <br />systems. At WSB, he works with growing and developed communities in the <br />expansion and rehabilitation of their water and sewer infrastructure. He has <br />experience in project planning, feasibility studies, computer modeling, preliminary <br />and final design, bidding, construction management, grant writing, wellhead <br />protection planning, risk assessments, emergency response planning, community <br />engagement, and state water permitting. Ray is passionate about groundwater, water <br />reuse, water treatment, sustainable design, and community involvement. <br />Production Well No. 8 & Well House No. 8 1 Caledonia, MN <br />CLIENT: CITY OF CALEDONIA <br />PROJECT DURATION: FEB 2020 - CURRENT <br />Served as a project manager in the permitting, project coordination, design, bidding, and <br />construction management of Production Well No. 8 and Well House No. 8 in the City of Caledonia, <br />Minnesota. Analyzed water quality results to size chemical feeds system and completed hydraulic <br />calculations to identify pump sizing requirements. Ray also coordinated funding with the Public <br />Facilities Authority and other state agencies, laboratories, and the community to satisfy expectations <br />and provide quality drinking water to the city's residents. <br />County Road 8 Stormwater Reuse System I Hugo, MN <br />CLIENT: CITY OF HUGO <br />PROJECT DURATION: JAN 2019 - CURRENT <br />Currently serving as project engineer in the grant and project coordination, design, and bidding of <br />the County Road 8 Stormwater Reuse project. He worked with the City to obtain a total of $618,400 <br />in grant funding to go towards the reuse system and worked on the design of the distribution system, <br />pump station, and irrigation system upgrades. <br />Water Tower No. 4 1 Hugo, MN <br />CLIENT: CITY OF HUGO <br />PROJECT DURATION: JAN 2019 - JUN 2021 <br />Served as a project engineer in the planning, permitting, project coordination, design, bidding, and <br />construction observation and administration for a new 1.5-million-gallon water tower for the City of <br />Hugo, Minnesota. Project includes watermain extension, connection to existing water distribution <br />system, site improvements, and modifications to existing SCADA system. <br />